Loading…
Loading…
4,624 results • Best match
Shifting and Diversion of Existing 33KV and 6.6 KV HT OHL F no 3,4,11 and 13 towards North side and F no 15 towards East side from existing place near Tapovan s/s for providing space to HOE working in that areas for OB and Coal Exposure.
Pole Mounting work of 33 KV Gr Cable to connected HT lines including Outdoor Heat termination kits
QUANTUM OF WORKS INVOLVED FOR (INCREASING CAPACITY OF 25 kva to 63 Kva DISTRIBUTION TRANSFORMER AND OTHER RELATED WORKS IN THE AREA OF E.D.S.D.-II, HASANGANJ UNDER THE E.D.D. V, HASANGANJ, UNNAO. UNDER BUSINESS PLAN YEAR 2026-27.
Laying stringing and sagging of 11 HT Lines by ACSR weaseal conductor including all associated work with joint/jumpers and binding of insulator as required.
Work
Laying, sagging and stringing and jumpering/binding etc. in 33 KV/11 KV / LT lines as per RESPO manual and as per direction of supervising engineer.
LIFT IRRIGATION WORKS
Construction of 3 phase 3 wire 11 KV HT line as per REC standard confirming to RE Rules 1956 excluding 400 Kg. 10 Mtr. Long PSC pole ...
LIFT IRRIGATION WORKS
Construction of 3 phase 3 wire 11 KV HT line as per REC standard confirming to RE Rules 1956 excluding 400 Kg. 10 Mtr. Long PSC pole ...
LIFT IRRIGATION WORKS
Construction of 3 phase 3 wire 11 KV HT line as per REC standard confirming to RE Rules 1956 excluding 400 Kg. 10 Mtr. Long PSC pole ...