4,639 results • Best match
Replacement of ACSR bare conductor by Insulated Covered Conductor (AAAC) in 11 KV Feeder No.-04 under 33/11 KV S/s Sector-03, SIDCUL under EDD-I, Rudrapur
Dismantling of existing HT line including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light connections etc. including rolling of conductor and cartage back from site to JE store(ACSR Rabbit)
Work of repair/replacement of damaged poles, wires, transformers due to natural calamities during the EDSD-IIIrd, Chakiya under 33/11KV Naugarh, Chakarghatta, Jogeshwarnath, Chakiya Tehsil and Chakiya Gramin in EDD-Ist, Chandauli.
Work of Trimming of tree branches lying on LT/HT line.
Repair of punctured 110kV 240 sqmm XLPE UG Cable of 110kV SRS-PHC line near Settlement area in Hubballi City, Dharwad District in Operation Division, KPTCL Hubballi including Supply of materials/ equipments, Erection, Civil works, Testing & Commissioning on Partial Turnkey Basis
SL.NO Activity Period in Months for the Work of Construction of Transmission Lines Period in Months for the Work of Construction of Transmission Lines
REPLACEMENT OF DAMAGED/RUSTED LT/HT POLE, INSTALLATION OF 250 KVA ADDITIONAL, CAPACITY INCREASING OF DISTRIBUTION T/f 63-100 KVA, 100-250 KVA AND CONSTRUCTION AND STRENGHTNING OF 11 KV U/g LINE AT DIFFERENT SUBSTATIONS UNDER EUDD-BAMRAULI
Erection of single support pole 9 mtr long STP for LT line , including fixing of necessary clamps, angle, channel and insulator,Nut & Bolts etc (All materials will be arranged by the conctractor except 9 m ST Pole)
BP 2026-27 WORKS IN THE AREA OF SDO 3 BARAUT UNDER EDD 1 BARAUT IN JURISDICTION OF EDC BAGHPAT
Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of support (pole) For HT/LT Line and complete work as per RESSPO Norms. PCC Pole 08.5 Mtr AND 9 MTR PCC POLE .
Providing Electrification, Street Light and Illumination in Shopping Centre in Sector 6 at Jind
24.2.1 LT CABLE 1. Supply & erection of LT phase separator on LT line complete in all respect up to entire satisfaction of the Engineer-in-charge of the work. [Through Rate]