Loading…
Loading…
4,680 results • Best match
Development of Infrastructure facilities in Rural market at Vivekananda Pally Market under Satchand Agri Sub Div SH Installation of 1 one No SBDTW 150mm x 100mm dia size for drinking water facilities 2HP Submersible pump thereof 2nd Call
Extension of electric Service connection with providing 30 mtr. Length of LT line in/c providing & fixing GI pipe of 40 mm dia TATA medium class of 3 mtr. Length fitted in the CC Block :2:4 of 300mm x 300mm x 500mm as per direction of Engg. –in-charge.
Erection of 110 KV DC line on DC towers for making LILO arrangements in 110KV Kavanoor - Ilayankudi - Maravamangalam feeder to the proposed Athapadakki 110 KV SS (Loc.22 to Loc.35) Reach - III
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete.
Erection of 110 kV DC line on DC Towers by making LILO of the existing Sankarapuram - Thiyagadurgam feeder at the proposed Peruvangur 110 22 kV SS with supply of all materials
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete.
Erection of 110kV DC line on DC tower with panther conductor by making LILO of the existing 110kV Cuddalore- Chitharasur feederat the proposed Pudukadai 110 KV Sub station with supply of all materials
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete.
CONSTRUCTION OF 4 NO 33 KV FEEDER FROM NEW 132/33 KV SUB-STATION KHATIMA(U.S.NAGAR)
Lopping and Chopping of tree branches near HT/LT line.
Earthwork excavation, Stub setting, concreting, erection, stringing of panther conductor and earth wire for erection of 110 KV DC line ( 6.86 KM) on DC tower by making LILO of the Sankarapuram - Villupuram 110 KV feeder to the proposed Kattusellur
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete.