Loading…
Loading…
4,682 results • Best match
Estimate for providing L.T. extension to left out houses from various Sub-Stations in (E) Section Tikkar under ESD, HPSEBL No II, Joginder Nagar.
"Erection Part LT":- Mannual Carriage of 0.270KM 1-Phase LT line material on steel tubular pole from road head to site of work considering average lead 1 Km. (0.27x1=0.27Km ) Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc.
EXECUTION OF WORK FOR INCREASING CAPACITY OF TRANSFORMER AND SYSTEM AUGMENTATION/ STRENGTHENING (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-KAURIRAM, GORAKHPUR AGAINST BUSINESS PLAN SCHEME 2026-27
Laying, stringing, sagging, binding and jumpering of LT AB Cable difference size as per Estimate for LT Line with fixing of Suspension Clamp with I Hook (Insulated), dead end Clamp with I Hook (Insulated), Piercing Connector (Insulated) along with installation LT Three phas Distribution box with clamp and nuts & bolts off siz as per required
Estimate for bifurcation of F4 Hulihydera IP feeder load to new feeder by providing 11KV link line from existing F4 Hulihydera feeder emanating from 110KV/11KV MUSS Kanakagiri in O&M Kanakagiri section of O&M sub division Gangavathi, under Partial Turn Key basis (Poles & Conductor will be supplied by the GESCOM)
19 821931-Guarding material Nos. 2 Fixing guarding including fixing of necessary cross arms for existing HT and LT line at Road Crossing, Telephone Line Crossings up to span of 60 mtrs. 2
Erection of 11KV Link Line and Continuous Power supply near from Kargal Chiana Gate Circle to TP Pump house and Jackwell in TP Jog Kargal Limits
Fixing guarding including fixing of necessary cross arms between HT and LT line up to a span of 40 mtrs for - Anticlimbing Device - Ordinary Soil
Providing electrical TC and electrical infrastructure to CMC Office under Chief Minister Amrutha Nagarothana(Municipality) Project Phase 04 in Tiptur CMC Limits ( change of AP)
LT wiring from DTC to LT line through metering box and LT projection fit single circuit ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.
Improvements of road NH-50 to Valasang, Beeri(K), Nagral, Kudli, Nittur(B), Balur, Halhipparga cross MDR road from km 26.00 to 29.00 in Bhalki Tq Bidar Dist. BDR25222313
Guarding for Road crossing, Telephone Line Crossing, between HT & LT Line Crossing