Loading…
Loading…
4,660 results • Best match
GE/KHU-106/2025-26 MAINTENANCE OF E/M MISC ITEMS IN THE AOR OF AGE E/M UNDER GE KHUMBATHANG
Supply and fixing in repair LT line separator suitable for three phase four wire water proof, weather proof, shock proof, Resistant to chemicals , robust construction easy to install low maintenance and fine uniform finish all as directed by Engr-in-charge.
REPAIRS AND MAINTENANCE OF HANGAR BAY LIGHTS,SUN SHELTER, HIGH MAST LIGHTS AND MISC SECURITY LIGHTS AND ITS ALLIED WORKS UNDER GE (AF) MARATHAHALLI
M&L for checking the serviceability of street light/flood light fitting of any capacity from pole/bldg and refixing the same after all repair work including wiring from OH LT line complete all as specified and directed by Engr-in-charge.
Constrution of 33 KV OH and UG line from 132 KV S/S Pilibhit to 33 KV S/S Amariya and increasing capacity of 33/11 KV Sub-Station Jahanabad and other associates works under EDC Pilibhit
... Stringing and sagging of three nos. Earth/GI wire with cardle guarding of above 33 KV line as per RESSPO Norms including provision of all necessary clamps and hooks. Shifting of existing line conductor of 11 KV/LT line to maintain proper clearance in between both lines (all required material will be provided ...
New feeder from 33/11 KV S/S Upera for load enhancement 17-300 KVA at Trauma Centre, Sikhaira, Garhmukteshwar, Hapur.
jumpering of LT/HT lines for proper energization, including cutting, dressing, binding and fixing of jumpers ...
REPAIRS TO LT OH LINE, LT UG CABLE, LT PANELS, STREET LIGHTS AND REPAIRS / RENEWAL OF DAMAGED WATER SUPPLY DISTRIBUTION LINE AND ALLIED WORKS AT CERTAIN UNITS UNDER GE (U) SECUNDERABAD
S&F in replacement LT line rigid PVC Spacers spiral type, two lines, Phase to phase distance 300 mm, spacer rod dia 13 mm, spiral hole dia 5-6 mm and spiral length 250 mm.
NIT 23 RATE CONTRACT FOR WORK OF PROVIDING, LOWERING, LAYING AND JOINTING OF PIPE LINE AND ALLIED WORKS UNDER DIVISION SHAHPURA, JAIPUR
... valves, non return valves, butter fly valves etc. in existing Distribution/ Rising Main/ Transmission Main pipe line of following sizes, works include de-jointing of valve, dewatering, taking it out of ...