Loading…
Loading…
15,364 results • Best match
Design, Construction, Testing, Commissioning of All The Components of Interception and Diversion Based Sewage Treatment Plant (STP) Work Including 05 Years of Operation and Maintenance of The Entire System in Municipal Council Arang under SBM 2.0
Design, Construction, Testing, Commissioning of all the Components of Interception and Diversion Based Sewage Treatment Plant (STP) work Including 05 Years of Operation and Maintenance of the Entire System In Nagar Panchayat, Bilha under SBM 2.0
Design, Construction, Testing, Commissioning of All The Components of Interception and Diversion Based Sewage Treatment Plant (STP) Work Including 05 Years of Operation and Maintenance of The Entire System in Nagar Panchayat, MALHAR under SBM 2.0
Design, Construction, Testing, Commissioning of All The Components of Interception and Diversion Based Sewage Treatment Plant (STP) Work Including 05 Years of Operation and Maintenance of The Entire System in Nagar Panchayat, Kunkuri under SBM 2.0
Repairing and Restoration Work of Existing Bidada 9 MLD capacity Water Treatment Plant At Bidada HW Under Mandvi Part - I RWSS Ta. Mandvi under Action Plan 2025-26
U.P.V.C. Pipe ( SCH- 40) for cold water including fittings make
and infrastructure works for installation of Submersible pump in Puthenapadam in Kuzhuppilly panchayath Supply and installation of Submersible pump and pipe laying-General Mechanical Work-re tender
OD46370/2025-2026:Supply, installation, testing, trial run and commissioning of submersible pumpset with minimum efficiency 65% capable of discharging 511 lps against total head of 6.5 mtrs, with electric motor 75 HP suitable for handling fresh and silty water with maximum rpm 1000. The material of construction of the casing NICI and impeller shall be stainless steel CF8M with Chrome steel A276 type shaft. The prime mover for the pump should be 3 phase totally enclosed water cooled motor confirming to IS 9283 , energy efficient standard rating suitable for 415V +/- 10%, 50Hz +/- 5% connection with class ?H? insulation, suitable cable confirming to IS 732:2019, length 15 m / as per site conditions. Meter board with fuse as per KSEB specification and electrical inspectorate norms, prefabricated closed type control panel board completely wired and fitted with fully automatic star delta starter, main switch with ISI mark, Ammeter, volt meter, VSS, RYB indicating lamps, 6A MCB for RYB indication lamp, HRC fuse, neutral link, ELCB, suitable capacitor, SPP, 2 nos of earth pit suitable for motor as per KSEB specification and electrical inspectorate norms, with all necessary protection units and instrumentation with MPU Panel board and 700mm Gate valve