Loading…
Loading…
15,610 results • Best match
REPAIR / REPLACEMENT OF PLUMBING, TILING, SANITARY FITTINGS, JOINERY AND OTHER CONNECTED WORKS IN OMQ AREA UNDER AGE B/R-1 AT AFS THANJAVUR
S&F in repairs Vitreous china wash down water closet (Pedestal pattern) , white in colour including fixing bolts, connection to drain and to flushing pipe, ball valve float and PVC flush pipe 32mm dia with white seat cover, closed pattern with flat bottom and cover and mild steel chromium plated or hinging device complete all as specified and as directed.
REPAIRS TO COMPOUND WALL, PATH AND FLOORING, PLUMBING, SANITARY FITTING AND OTHER ALLIED WORKS TO CERTAIN BLDGS AT MIL STATION BHUSAWAL UNDER GE (S) AHILYANAGAR
Excavation in trenches, not exc 1.5m wide and not exc 1.5 m in depth, in any type of soil for foundation, laying pipes for drains or manholes etc, n exc. 10 Sqm on plan and n.exc 1.5 m in depth and getting out including trimming sides and forming bottom surfaces to required level/slope etc complete all as specified and as directed.
REPAIR/REPLACEMENT PVC TANK, CLEANING OF PVC TANK, ROOF TREATMENT INCLUDING PLUMBING FITTINGS AND OTHER MISC WORKS AT AF STN SINGARSI UNDER AGE (I) AF STN SINGARSI
M & L for Cleaning and removing all scale and dirt, etc, from tanksand from mouths of circulating pipes, etc. not exceeding 500 ltr of any description and in any position comprising the following five stage . (a) 1st stage: Drain out the water by using exit valve or with high capacity dewatering system or any other suitable method approved by Engr-in-Charge. (b) 2nd Stage: Cleaning all the algae formation inside the tank by scrubbing the walls of the tanks. (c) 3rd stage: Cleaning with fresh water . (d) 4th stage: Sterilization by using calcium hypochlorite (bleaching powder). (f) 5th stage: Cleaning with fresh water. After cleaning of the tank, date of cleaning and due date should be clearly mentioned on the tank. (paid Separately) Note: Clause (i) to (v) applicable for work carried out under ser item no. 1 to 4 for subject contract. (i) If any complaint regarding tank incomming pipe and outgoing pipe , discharge of water, float valve and pressure of water supply to out going pipe, overflow of tank to corresponding bldg received vide users/stn authority or by this office same shall be carried out within 24 hrs up to 9 months from the date of cleaning of tank. If the contractor failed to carried out the above complaint witin the time mentioned above penality of Rs.500.00 per complaint/day shall be imposed to the contractor and recovery shall be done from the contractor. (ii) Before tank cleaning work to be carried out contractor shall inform the building no. two day in advance in writing to Engr in charge , So that same shall be comunicated to users for storage of water. (iii) Before cleaning work to be carried out contractor shall check the tank, If any breakage /crack of tank shall found ,contractor shall immedetly notify to Engr in charge in written . (iv) After disconnecting or after cleaning of tank found damage or leakage the same shall be replaced by the contractor at his own cost within the 12 hr . If contractor fails to replace the tank within the time period ,the penality of Rs. 500 per day shall be imposed to the contractor till the Replacement of Tank and recovery shall be made from the contractor. (v) Contractor or his agent has to be reported daily at 10.30 am regarding receving the complaint and also to inform about planning of cleaning of tank to be carried out after 48 hrs.
PROVN OF MICRO RECHARGEABLE BOREWELL ALONGWITH CATCHMENT DRAINAGE SYSTEM AT SEC C IN PATIALA MIL STN
S&F Framed work such as grills, gratings, etc.. with ends of bars shouldered and/or riveted, or forged into spikes; framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; framework of water tanks and similar work conforming to Fe.290.Gde-E-165 all as specified.
Supply, Installation and Commissioning
Comrehensive O&M : Operation and Maintenance Charges of the whole water supply scheme on SCADA & Automation and generation of daily report of water quality parameters and electrical parameters with specific consumption in kWh/ml . The report shall be mailed daily to the head quarters for monitoring purpose. It will also include Mobile application developement & Yearly Software Subscription Fee
Custom Bid for Services - Supply of Drinking potable water for VVSPL-IPS2, Custom Bid for Services - Supply of Water for FWT VVSPL IPS2, Custom Bid for Services - Supply of water for Gardening purpose VVSPL-IPS2, Custom Bid for Services - Supply of ... of Water for ... Displacement Water tank ... of Water Tanker ... of Water Tanker ... of Water Tanker ... of Water Tanker
Custom Bid for Services - Supply of Water for Displacement Water tank Similar Category Hiring of Water Tanker Service Hiring of Water Tanker Service Hiring of Water Tanker Service Hiring of Water Tanker Service