Loading…
Loading…
15,001 results • Best match
Canal Water Based Water Supply Project for Construction of 5.00 MLD Water Treatment Plant WTP and other related works including 5 years O and M Part 2 at Samrala Town District Ludhiana Punjab under AMRUT 2 Scheme
Canal Water based Water Supply Project for Construction of 5.0 MLD Water Treatment Plant and other related works including Operation and Maintenance for a period of 05 years (Part-2) and Supplying, Installation, Testing of Solar Panels including other required equipment as per Guidelines of Punjab Energy Development Agency (PEDA) over Raw Water S&S Tanks of Water Treatment Plants with Operation and Maintenance for a period of 07 years under AMRUT 2.0 Scheme Town name Rampura Phul
Comprehensive Operation and Maintenance Contract for 6 Nos Sewage Treatment Plant at various stations between IITK and MTJM 1 No Sewage Treatment Plant and 2 No Effluent Treatment Plant at Kanpur Metro Depot in UPMRCL at Kanpur
Civil Works
A/mtc of Water Treatment Plant Sector 34 U/E Rohtak
[20.63.5]`Providing, lowering, laying in trenches, aligning, fixing in position and jointing Ductile Iron (DI) ISI marked K-9 grade SandS pipes as per 15:8329-2000 (amended up to date), with internal cement mortar lining for potable water with rubber ring (EPDM/SBR) joints as per IS: 5382-1985 (excluding special accessories) complete including all material, labour, hydraulic testing and commissioning as per Technical Specifications and as per direction of Engineer. Note: E/W to be measured and paid separately. ` 5. 300 mm i/d
Emergency repairs to Surepally Lift Irrigation Scheme on Musi River in Surepally Village Bhongir Mandal Yadadri Bhuvanagiri District
Providing and Laying of Water Supply Line 3 inch dia GI Pipe in Different Areas of Ward 81 under Zone 2
Providing and Laying of Water Supply Line 3 inch dia GI Pipe in Different Areas of Ward 81 under Zone 2 (1 Work)
Providing House Connection for existing and new Pipe Line Prov. Laying jointing, Testing PVC pipe specials for Distribution System Sluice valve Chamber Chlorinator Repair of Pump Chamber and All other works Complete in all respect
Providing House Connection for existing pipe line & new Pipe Line Prov. & Laying jointing, Testing PVC pipe, specials for Distribution System, Sluice valve, Chamber, Chlorinator, Repair of Pump Chamber & All other works Contigent there to Complete in all respect.