Loading…
Loading…
14,998 results • Best match
(94766) Providing and laying 350mm dia. Sluice Valve and pipe line at sector 5 water supply pump house in airoli ward.
(94766) Providing and laying 350mm dia. Sluice Valve and pipe line at sector 5 water supply pump house in Airoli ward.
Providing House Connection for existing and new Pipe Line Prov. and Laying jointing, Testing PVC pipe specials for Distribution System, SV, Chamber Replacement of Control Panel, Repair of Pump Chamber, OHSR Complete in all respect.
Providing House Connection for existing pipe line & new Pipe Line Prov. & Laying jointing, Testing PVC pipe, specials for Distribution System, Sluice valve, Chamber, Chlorinator, Replacement of Control Panel, Repair of Pump Chamber, Repair of OHSR & Development of water works etc. & All other works Contigent there to Complete in all respect.
Replacing damaged tiles,leak rectification,solid masonry works,Man hole repair,RCC cover slabs,water proofing treatment,Vitrified tiles,Acid washing ,GI tubular grill work, GI sheet etc
22.5:Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed with water proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.
Prov. House Connection for existing and new Pipe Line Prov. Laying jointing Testing PVC pipe specials Sluice valve Chamber Chlorinator Replacement of Control Panel Repair of Pump Chamber OHSR and All other works Complete in all respect
Providing House Connection for existing pipe line & new Pipe Line Prov. & Laying jointing, Testing PVC pipe, specials for Distribution System, Sluice valve, Chamber, Chlorinator, Replacement of Control Panel, Repair of Pump Chamber, Repair of OHSR & Development of water works etc. & All other works Contigent there to Complete in all respect.
Design, Drawing, Construction, Testing and Commissioning of Sewerage System, 220 KLD Sewage Treatment Plant (STP) and 55 KLD Effluent Treatment Plant (ETP) for City hospital in Berhampur including Operation and Maintenance for a period of Five Years
Construction of STP & ETP Designing, drawing, supplying, constructing, testing & commissioning of Effluent Treatment Plant (ETP) & Sewage Treatment Plant (STP) of required capacity and appropriate technology (MBBR / SBR / MBR) including all civil, electro-mechanical works, tertiary treatment system, automation etc all complete to achieve desired effluent quality as per NGT norms. (Excluding cost of SCADA system, PLC, plant room, chemical storage room, yard lighting, compound wall, external electrification, treated water storage sump and re-use/disposal arrangements) ETP- 55 KLD STP- 220 KLD
PROVISION OF SEWAGE TREATMENT PLANT (STP) AT BHADURIYA COMPLEX UNDER GE (SOUTH) PATHANKOT
Lumpsum price worked out by the contractor for Internal Water Supply Works as listed in Schedule 'A' Part-III.