Loading…
Loading…
15,596 results • Best match
Replacement of existing worn out 10 cusec 10 m 60 HP pumping unit along with pipes bend, foot valve etc at Lift Irrigation DW Scheme Texoo
MINOR ORIGINAL OF WORK AND CONSTRUCTION OF TOILET ADDITIONAL ROOM BOUNDARY WALL WATER SUPPLY SANITARY WORK ELECTRIFICATION FITTING DISTEMPARING EMULSION PAINTING ANNUAL REPAIRING DOOR WINDOW ROOF TREATMENT FLOOR BLOCK KARKELI
... ADDITIONAL ROOM BOUNDARY WALL WATER SUPPLY SANITARY WORK ELECTRIFICATION ...
MINOR ORIGINAL OF WORK AND CONSTRUCTION OF TOILET ADDITIONAL ROOM BOUNDARY WALL WATER SUPPLY SANITARY WORK ELECTRIFICATION FITTING DISTEMPARING EMULSION PAINTING ANNUAL REPAIRING DOOR WINDOW ROOF TREATMENT FLOOR BLOCK MANPUR
... ADDITIONAL ROOM BOUNDARY WALL WATER SUPPLY SANITARY WORK ELECTRIFICATION ...
MINOR ORIGINAL OF WORK AND CONSTRUCTION OF TOILET ADDITIONAL ROOM BOUNDARY WALL WATER SUPPLY SANITARY WORK ELECTRIFICATION FITTING DISTEMPARING EMULSION PAINTING ANNUAL REPAIRING DOOR WINDOW ROOF TREATMENT FLOOR BLOCK PALI
... ADDITIONAL ROOM BOUNDARY WALL WATER SUPPLY SANITARY WORK ELECTRIFICATION ...
REPAIR / MAINTENANCE OF WATER SUPPLY PIPELINE AND VALVE PIT CHAMBER, PLANT AND MACHINERY, CHEMICAL TREATMENT PLANT, FILTER PLANT AND ALLLIED WORKS AT SITE P AND R UNDER GE (AF) THANE
... in depth for taking out/laying pipe line and getting out, in ...
Laying of 250mm dia SWG sewerage pipe line from Talent Park School, Aditya Nagar to H.No. 8-1-21/83, Surya Nagar Colony under Shaikpet Section, Sub Division-I of O and M Division-III(Old) New (OU Colony Ward GM-14)
Annual Maintenance of Engaging Labours for Pump operation, Sewage Treatment Plant Operation in Collectorate building in Tirupathur of Tirupathur District
... Building for pump operation and water supply to the over head tanks above ...
Operation and Maintenance of 1 No. Sewage Treatment Plant- 30 KLD (STP) in Dwarka Metro Police Station at Dwarka Metro station in Line-3 section and 1 No. Sewage Treatment Plant - 50 KLD (STP) at D-21, Corporate park (Airport line Depot).
Operation and maintenance of 1200 M3 capacity Sewage Treatment Plant (STP) at Headland for a period of two years (2026-2028)
... sample results of treated sewage water of the Sewage Treatment Plant of following locations through ...
LAYING OF LINE AND CONNECTING TO THE WASTE WATER TREATMENT PLANT FOR TREATMENT WASTE WATER FOR REUSE SHREYA RESTAURANT AND FROM SHEELAVANTA HOUSE TO JYOTHI GRUHA UDYOGA IN ADARSHA NAGAR WARD NO 05 OF CITY CORPORATION VIJAYAPURA.
... CONNECTING TO THE WASTE WATER TREATMENT PLANT FOR TREATMENT WASTE WATER FOR REUSE SHREYA RESTAURANT ...