Loading…
Loading…
15,005 results • Best match
REPAIRS TO JOINERY, INTERNAL WATER SUPPLY, FALSE CEILING, ROOF TREATMENT AND PERIODICAL SERVICES TO CERTAIN BLDGS AT HARNI AND HARNI AIRFIELD AT AFS BARODA
Removing existing unserviceable water proofing treatment taking down cement plaster etc, of any description and cleaning of top surface of cement concrete flushing out junction of parapet walls & washing down with water to remove all dirt etc including preparation of surfaces to receive new treatment and removing the rubbish off premises complete all as specified and directed
Canal Water Based Water Supply Project for Construction of 4.3 MLD Water Treatment Plant (WTP) and other related works incluidng 5 year O and M (Part 2) at Talwandi Bhai Distt Ferozepur Punjab Under AMRUT 2.0 (E Tender 90)
Construction of Water Treatment Plant at Golaghat Polytechnic Campus
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. 20 mm nominal dia Pipes (Adding 6% additional GST)
State Plan-2025-26-Guruvayur Drainage Scheme- Supply-Installation- Testing and Commissioning of Sewage Transfer pump seta t S e w e r a g e T r e a t m e n t P l a n t - Chakkamkandam- Guruvayur-General Civil Work
OD162481/2025-2026:Fixing of Sewage transfer pump with all accessories - Supply, Installation, Commissioning, testing and trial run of submersible sewage handling type pump, with specified discharge and head and of reputed make, 25 HP including suction and delivery pipes ,starter, induction motor, capacitor etc complete as per the direction of engineer in charge.
Construction of Water Treatment Plant at Golaghat Engineering College
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. 18.7.2 20 mm nominal dia Pipes (Adding 6% GST)
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; Specialized agencies; Under AMC and functional
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; Specialized agencies; Under AMC and functional