Loading…
Loading…
14,254 results • Best match
Providing Water Supply Scheme and Solar Panel For Anganwadis at Bhosare Tal-Madha Dist-Solapur
Item No. 1 :- Excavation for foundation / pipe trenches in earth soils of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift 0 to 1.5 M) (Bd-A1/259)
Procurement, Supply, Installation, and Commissioning of Water Testing Laboratory Instruments/Equipment with Accredited Calibration Certificates and One-Year Warranty, Including Supply of Glassware, Certified Reference Materials (CRM), Miscellaneous ... for Water Quality ...
Providing , Supplying and Installation of water testing laboratories Instruments for 15 New
Sinking of 200 mm (all through) Big Dia Tube Well, Interconnection, and Laying of Parallel/ Dedicated Pipeline, Road Restoration, Providing FHTC and Construction of Pump House Boundary Wall under MATIHARPUR Piped Water Supply Scheme at Chanchal-I B
cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C. N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii)No part payment at any stage on account of supply of materials shall be entertained. iv)Payment will be made on actual consumption of materials. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. (A) Pressure Rating : Class - III (ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves.
Annual Tender for Monthly rate for prevent & repair leakage in water supply pipe lines at Bavla Municipality area at Bavla. (inclusive all type & size of lines with materials) & other work related to water supply maintainance(Fifth Attempt)
Construction of Side Drains from Anjaneyaswamy Temple to Ankamma Thalli Temple in Kesanupalli Village in Narasaraopet Mandal.
Construction of Side Drains & Culverts In OC Locality of Muthanapalli Village In Rompicherla Mandal.