Loading…
Loading…
15,036 results • Best match
Excavation LAYINGG OF HDPE PIPE LINE / BOOSTING STATION/PUMSET (1st time for L and C Society only)
Pipe Line
Providing Lift Irrigation Scheme Susnaal under HPCDP (Phase-II) Project-JICA-ODA Phase-II at Village Susnaal, G.P Barota, Tehsil Bharari, Distt. Bilaspur (H.P.)
Providing and laying delivery pipe 65 mm dia. GMS Tubes (Medium Class) (IS:1239 - 2004) jointed with MS flanges of table-5 as per IS: 6392-1971 (upto a length of 20 mtrs ) including rappers, flanges, rubber gaskets, nuts and bolts and specials upto 5 mtrs away from the outer wall of pump houses as per layout drawings approved by Engineer-in-Charge.(From Pump to Common header) 1 Mtr
Construction of Protection wall work near Jackwell cum Pump House in Holaluru Lift Irrigation Scheme at Holaluru Village Shimoga Rural Constituency in Shimoga Taluk and District.
Consrtuction of Protection wall work near Jackwell cum Pump House in Holaluru Lift Irrigation Scheme at Holaluru Village Shimogga Rural Constituency in Shimoga Taluk and district
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe and Providing FHTC for DUBA KHOSKAN piped Water Supply Scheme at Gazole Block in the District of Malda under Malda Division, P.H.E.Dte. (2nd Call)
N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii) No part payment at any stage on account of supply of materials shall be entertained. iv) Payment will be made on actual consumption of materials. v) UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi) Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii) All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of completion drawing of pipe line showing all specials,valves, etc with final bill is mandatory.(Cost of drawing will be paid seperately). vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and deduction for such work will be made accordingly. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill.
Laying HDPE pipe line in place of old damaged pipe line at diffrent ward at Alirajpur Dist Alirajpur
Laying HDPE pipe line in place of old damaged pipe line at diffrent ward at Alirajpur Dist Alirajpur
Providing New borewell and erection of submersible motor and laying pipe line works for Ward No. 27, Annamalai Nagar in Hosur City Municipal Corporation
Testing of pipes for water supply with hudralic testing equipments by filling with water including cost of water @ 60/KL and testing to recommended Pressure in convenient stretches and attending the brusts if any occurred during the test excluding the cost of pipes but including other incidential and operational charges ETC... complete for the following diameteres of pipes HDPE Pipe 90mm