Loading…
Loading…
15,036 results • Best match
NIT No. 01(2026-27)/EE(C)Dr-III
Providing Project Management Consultancy Services (PMC) for Decentralized Sewage Treatment Plants (DSTPs) for Zindpur along with its allied works under EE(C)Dr-III.
Sinking of Big Dia. Tube well, Inter connection between TW Existing Pipe line,Boundary wall, IEP and Laying of Dedicated pipe line for improvement of functionality of BHAIRABPUR Piped Water Supply Scheme at harishchandrapur-II Block of Malda Distric
cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C. N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii)No part payment at any stage on account of supply of materials shall be entertained. iv)Payment will be made on actual consumption of materials. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. (A) Pressure Rating : Class - III (ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves.
Release of Dholpur Lift Irrigation Diggi connections for Chak Nos 58, 85, 87, 93, 94 on ARC 2025 under AEN OnM Rajakheda of Dholpur Circle
Earthing of line for all type of supports as per REC construction standards using Stay wire/GI wire with one pcs.of M.S.rod 20mm dia each 3 meter long and driving into earth by mechanical means as per approved design.Drawing &specification.All material except MS rod,MS flat & stay wirewill be supplied by the contractor.If material is supplied by the contractor ,the payment will be made as per prevailing Discomstore issue rates.(In case of PCC poles earthing must be connected with earthwire already available on PCC pole at bottom)
INVITATION TO BID For Supply of Cooling Tower Water Treatment Chemicals At GPPC’s 702 MW Combined Cycle Power Plant at village Kovaya, near Pipavav, Tal. Rajula, Dist. Amreli Gujarat, India
1.2. The bidder must have supplied Water Treatment Chemical in Sea water based
Providing Lift Irrigation Scheme Chanjota under HPCDP (Phase-II) Project-JICA-ODA Phase-II at Village Chanjota, G.P Panjali Khurd, Tehsil Sadar, Distt. Bilaspur (H.P.)
Providing and laying delivery pipe 80 mm dia. GMS Tubes (Medium Class) (IS:1239 - 2004) jointed with MS flanges of table-5 as per IS: 6392-1971 (upto a length of 20 mtrs ) including rappers, flanges, rubber gaskets, nuts and bolts and specials upto 5 mtrs away from the outer wall of pump houses as per layout drawings approved by Engineer-in-Charge.(From Pump to Common header) 1 Job
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; 01 Nos 30KLD & 01Nos 60KLD; Functional but outside AMC and Warranty
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; 01 Nos 30KLD & 01Nos 60KLD; Functional but outside AMC and Warranty