Loading…
Loading…
14,199 results • Best match
GMO:- Provision of deep tube well with pump house at North & South side colony for supply of water to station & colony at GMO.
... colour complete, as per manufacturer's specification. 19 13.42.1 Two or more coats on new work Sqm 240 92.75 22260 13.44S EXTERIOR FINISHING Finishing walls with water proofing cement paint 13.44 of required shade : 13.44.1 New work (Two or more coats applied ...
Rectification Works of 2 nos Small Water Supply Schemes Under Package-1 to Marangattuppally Grama Panchayath in Kottayam District
Laying HDPE pipes (IS : 4984) on land portion including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi-automatic electrofusion machines, testing ...
Improvement of LC by providing piped water supply and furniture at various LC gates under jurisdiction of Sr. DEN/3/SEE.
18.0 WATER SUPPLY
Ratlam Division - Electrical work in connection with Augmentation of water supply arrangement at various 12 stations in connection with Simhastha 2028.
Ratlam Division - Electrical work in connection with Augmentation of water supply arrangement at various 12 stations in
Facility Management Services - LumpSum Based - Work of Pipeline Extension and Providing House Connections for Water Supply from Bus Stand Chauraha to Hanuman Temple over a Length of 450 Meters under the Drinking Water Arrangement Scheme in Ward No 3 ..
Facility Management Services - LumpSum Based - Work of Pipeline Extension and Providing House Connections for Water Supply from Bus Stand Chauraha to Hanuman Temple over a Length of 450 Meters under the Drinking Water Arrangement Scheme in Ward No 3 ..
Refilling of empty Chlorine Tonner 900 Kg. capacity for Central Sector Part I and II Surface Water Based Water Supply Scheme under MEDB,PHE Dte.in the district of Murshidabad.
... filled cylinder should be taken carefully. 2. Payment will be made on actual number of supply of filled up container against document of Filling station and document needed for sl no. 4 and 5 3. All work s should be taken up asper direction of EIC. 4. EIC will stipulate requirement of filled ...