Loading…
Loading…
13,265 results • Best match
Providing Crate Wall Embankment to Protect the Main Gravity Line MS Pipe 500mm dia near Kamand Bridge from RD 40 to 50 10 Mtr Under PDNA
Excavation in drains and channels etc. in earth work upto all depth in all kinds of soil such as pick jumper work blasting and chiselling soft / hard rock where blasting is prohibited in all leads and lifts i/c trimming & dressing of side levelling of bed stacking the excavated soil in 15 Cm ...
Zone No. I: Civil maintenance including Water supply, Sanitary and Horticulture works at Fairlie Place Building areas, Eastern Railway, Kolkata for the period ending 30.06.2027
B-[CIVIL, WATER SUPPLY AND SANITARY ITEMS] 5600689.28 Below/P
GOLAGARH ESTIMATE FOR UPGRADATION OF WATER SUPPLY SCHEME GOLAGARH AND PROVIDING DISTRIBUTION SYSTEM IN VILLAGE GOLAGARH DISTRICT BHIWANI CONSTRUCTION OF 1NO S S TANK CLEAR WATER TANK 1NO RCC FILTER BED CONSTRUCTION OF HIGH LEVEL TANK CONS
RAW WATER PUMP: Supplying, erection, testing and commissioning of Horizontal motor pumping set for Raw water having head as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked` 1700LPM x 12.00m x 10.00BHP
refer to BOQ
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed Engineer In-Charge :all kinds of soil :
Balance Integrated Infrastructure including Road (Stage - I), Footpath, S.W. Drains, Sewer line, Water Supply in Sector - 1A at Kharghar, Navi Mumbai.
Augmentation of Water Supply Scheme Village New Abadi Hamira in Block Dhilwan, District Kapurthala (Under head NABARD XXXI/State Share/4215)
... Valve duly ISI marked (IS-14846-2000 or latest) one each with inlet, outlet and scour pipes, including providing and installing inlet, outlet scour pipe and overflow DI double flanged pressure pipes DI K-9 horizontally as per IS 8329-2000 and latest Amendments duly ISI marked from bottom ...