Loading…
Loading…
14,809 results • Best match
05/2026-27
Construction of Sewage Treatment Plant 100 KLD (STP) With moter Pump for 24+96 Satna
Detail Survey, Investigation and Preparation of a DPR under DBO contract model for Upgradation and ACMC of Sewage Treatment Plants at Adampool, Sichey, Jalipool, Syari and Tathangchen.
Laying HPDE Water supply pipe line from Door no 8/52-A-20 to D no :8/48-A-D12 in 23rd Election ward at Mannuru in Rajampeta Municipality.
Dedicated Pipe laying for better Functionality and Providing Balance FHTC for MAHIL Water Supply Scheme at Gazole Block of Malda district under Malda Division, PHE Dte. Govt. of West Bengal, (2nd Call)
Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C.
Construction of 400 Bedded Boys Hostel Building at JIPMER Campus, Puducherry. (Civil Work): Building portion including internal water supply lines, Sanitary Installation, drainage, demolition of existing quarters & other development works. ... Passenger lift , ... Soar Water Heater, ... Masonry work , ... Finishing work , ... fittings, Water supply ... Water supply installations ... fittings, drainage and ... and water proofing ... proofing work treatment ... work treatment on ... Masonry work , ... Finishing work , ... fittings, Water supply ... Water supply intallations ... fittings, drainage and ... and water proofing ... proofing work treatment ... work treatment on ...
Laying Distribution of UPVC pipe line for improvement of Functionality of Ranghat Water Supply Scheme at Chanchal-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
HORIZONTAL ROAD CROSSING: Horizontal road crossing by Augor-boring including boring charge, pipe laying and jointing, making baricates, lighting arrangement etc. all complete as per direction of E.I.C. For 80 mm dia. to 200 mm dia. pipes.