Loading…
Loading…
13,699 results • Best match
Construction of RCC OHR along with Land Development Approach Road Guard Room and Boundary Wall ....... in all respect of proposed Water Supply Scheme at Kulti Girls school Zone-21 Kulti under AMRUT 2.0 Phase-III within AMC
... (intze type) of capacity 430 cu. m staging height 20 metre with Raft foundation including pipe connection at Kulti Area ( Zone-21 at Kulti Girls School), Guard Room, Land Development, ...
CONSTRUCTION OF ACADEMIC BUILDING AT CIPET, BHANPURI, RAIPUR I/C. WATER SUPPLY,FIRE FIGHTING, SANITERY FITTINGS & ELECTRIFICATION WORK AT DIST. RAIPUR( VIDHANSAHBA DN. RAIPUR). (BALANCE WORK) (Deposit Work- Without Escalation and Bonus)
Providing Water proofing treatment over Roof, Wall, Chhajjas, Balcony with Diamond Shield and Sealer coat or equivalent... groove in size of 5mm x 10m (WxD), filling of cracks with putty of Diamond shield with laying fiber glass mesh, Cleaning of surface by scrubbing with steel wire/ Nylon brush. Removing ...
I. Operation & Maintainance of ward level piped water supply schemes (Q affected/PWS) by deploying pump operators and payment of electricity charges and II. Comprehensive maintenance of Ward level water supply schemes (Q affected) i/c the cost of chemicals, cleaning of ESR and campus, maintenance viz. cleaning &painting of pump house, boundary wall, repair of leakages in distribuition line, repair and provision of new FHTCs, repair amd maintenance of pumps and other electro-mechanical components etc. all complete as per the directions of Engineer-in-charge.
1 I. Operation & Maintainance of ward level piped water supply schemes (Q affected/PWS) by deploying pump operators and payment of electricity charges and II. Comprehensive maintenance of Ward level water supply schemes (Q affected) i/c the cost of chemicals, cleaning of ESR and campus, maintenance ...
Day to Day supervision Maintenance of Rising Main and collecting lines, periodically washing, cleaning of OHRs / CWR and upkeeping of OHRs / Pump house campuses with all allied works related to water supply under Arrah W/S Scheme under Raghunathp
Day to Day supervision & Maintenance of Rising Main and collecting lines, periodically washing, cleaning of OHR's / CWR and upkeeping of OHR's / Pump house campuses with all allied works related to water supply under Arrah W/S Scheme under Raghunathpur Sub-Division, PHE Dte. (w.e.f. 01-09-2026 to 31-08-2027)
Deployment of care taker other personnel for maintenance of Inspection Bungalow (C1, C2, C3) at Lakshmanpur WTP of Raghunathpur water supply Project under Raghunathpur Sub-Division under Purulia Division, PHE Dte. (w.e.f. 01-09-2026 to 31-08-2027
Deployment of care taker & other personnel for maintenance of Inspection Bungalow (C1,C2,C3) at Lakshmanpur WTP of Raghunathpur water supply Project under Raghunathpur Sub-Division under Purulia Division, PHE Dte. (w.e.f. 01-09-2026 to 31-08-2027)
Construction of Science Building (G plus 4 storied) at MBB College Agartala Tripura_ Vertical extension from First Floor to Fourth Floor on existing Ground floor _SH_ Building portion including internal water supply, sanitary installation, sewage,
Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound, as directed by Engineer-in-Charge and consisting of applying... consisting of applying : (a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for ...