Loading…
Loading…
14,363 results • Best match
Laying underground pipeline for outlet RD 58505/TL of Payal Minor excluding supply of pipe.
Jointing and cutting of RCC NP-2 plain end pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment as per IS 458:2003 ( @2.50 metre / No)
Laying underground pipeline for outlet RD 8465/TL of Bardhal Minor excluding supply of pipe.
Jointing and cutting of RCC NP-2 plain end pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment as per IS 458:2003 ( @2.50 metre / No)
ANNUAL RATE CONTRACT FOR MDPE PIPE NETWORK LAYING LMC INSTALLATION AND ASSOCIATED WORKS FOR PANIPAT
Receiving and taking-over as defined in the scope of work & specifications, handling, loading, transportation and unloading of owner supplied GI pipes of all dia.,GI fittings, Isolation valve, appliance valve,brass adopter Anaconda, Meters,Regulators,Suraksha hose pipe with clamps,GI sleeves, GI fittings and other free issue items from owner's designated place(s) of issue to contractor's own stock-yard(s)/ Work Shop(s)/ work-site(s) including proper storing, stacking, identification, providing security & insurance cover, including installation of GI line (alongwith installation of required accessories as mentioned above) of following sizes, including fabrication, consumables, labour and other incidental works and handing over the same after return of the surplus pipes, fittings, valves & other accessories to the owner's designated store; carrying out all temporary, ancillary, auxiliary works required to make the GI line ready for commissioning as per drawings, specifications, scope of work and other provisions of contract document and instructions of EIC/ SIC, including but not limited to carrying out the following:
Day to Day operation and Maintenance of 52 MGD (236 MLD) Capacity Water Treatment Plant for Falta-Mathurapur Mega Project at Dongaria for 1 (one) Year including supply of all required chemicals, Laboratory reagents, deployment of required manpower ..
Day to Day operation and Maintenance of 52 MGD (236 MLD) Capacity Water Treatment Plant for Falta-Mathurapur Mega Project at Dongaria for 1 (one) Year including supply of all required chemicals, Laboratory reagents, deployment of required manpower and security guards for all Civil & Electro-mechanical units and it’s repair with maintenance of Sludge pumping machineries, 5 nos. HSC (1600 KW) Delivery pumping units with 3940 m3/hr. flow rate & 101 mtr. head, 33KVA/6.6 KVA/ 0.433 KVA Sub-station, operation and maintenance of water testing laboratory maintenance of fully automated SCADA by Civil / Electrical Engineer including maintenance of Air conditioning system, video surveillance, indoor/ outdoor illumination system, garden and time to time jungle clearance and sludge removal etc. as per directions of EIC under South 24 Pgns. W/S Division-I, PHE Dte.
Water proofing treatment on roof of Govt. Resi. and Non Resi. Building under Central Store Sub Dn. PWD. Bhopal.
10 22.5 Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. sqm 207
Water proofing Treatment in Govt Building Residential and Non Residential bulding Under Section Khirkiya Sub division Khirkiya Division Harda
Water proofing Treatment in Govt. Building Residential & Non Residential bulding Under Section Khirkiya Sub division Khirkiya Division Harda