Loading…
Loading…
14,512 results • Best match
Water proofing Treatment in Govt Building Residential and Non Residential bulding Under Section Khirkiya Sub division Khirkiya Division Harda
Water proofing Treatment in Govt. Building Residential & Non Residential bulding Under Section Khirkiya Sub division Khirkiya Division Harda
Water proofing Treatment in Govt Building Residential and Non Residential bulding Under Section Timarni Sub division harda Division Harda
Water proofing Treatment in Govt. Building Residential & Non Residential bulding Under Section Timarni Sub division harda Division Harda
Supply and laying of 100mm dia DIK-7 water pipe line from shayam khatuji garment koniya hanuman mandir to vijay maurya house no.-A 38/50-B in rajghat ward in adampur zone-1 remove polluted water problem.
Supply & fixing of bend, Joints etc during laying work of water line including all labor, material, T&P et complete.(10% of pipe cost)
Construction of Drains and Treatment Procedure of Waste Water (GWM) at Village Ladhiyapur Block Ballabgarh District Faridabad
Construction of Drains and Treatment Procedure of Waste Water
Construction of Drains and Treatment Procedure of Waste Water (GWM) at Village Bijopur Block Ballabgarh District Faridabad
Construction of Drains and Treatment Procedure of Waste Water
CONSTRUCTION OF 750 KLD SEWAGE TREATMENT PLANT (STP) BASED ON CONSTRUCTED WETLAND TECHNOLOGY AND 05 YEAR OPERATION, MAINTENANCE IN SOOT MILL AWASIYA YOJNA, DISTT ETAWAH
Construcition, supply, installation, Testing and commissioning of 750 K.LD STP based on Constructed Wetland Technology including process and site layout Plan and site grading Plan Hydraulic diagram, single line diagram, basic electric drawing, civil General Arrangement drawings, structural design and drawings and construction drawing electrical and plumbing drawings operation and maintenance manaul etc. consisting of primary treatment unit treated effluent disposal drain/channel, interconnecting piping with required gates and valves, civil work for STP with supply and filling of required gravels, construction of operator room, biomedia and plantation work and other miss. work required for STP Complete including all associated civil, electrical (including external electrical connection) ,plumbing works and commissioning and installation work completed and including the operation and maintenance of STP For 5 Year including supply of chemical and consumables materials disposal of Plant residuals(e.g. Screenings, Grit and Dewatered Sludge) Man power required General maintenance of Civil Structure preventive and breakdown maintenance of electrical Items, Field Instruments etc., Cost of Collection Analysis reporting, Monitoring and maintaining record of samples from the raw sewage and treated sewage daily collected atleast for one time a day from the entry and exist of the STP Unit there on (including power) as mentioned in the Tender.