Loading…
Loading…
14,888 results • Best match
Balance works in c/w "Laying of 1200mmØ DI, K-9 Sewerage pipe through 1500mm & 1700mmØ double M.S. casing pipe at 20 degree skew passing under railway track/land near Km. 74/7-8 between Abohar & Panjkosi stations on BTI- SGNR section for Executive ... & Sewerage Board, ...
Item Rate for jointing & laying of M S casing pipe of 1700 mm internal dia by cut & cover method at given site under Rly track and hook up with the main pipe on both sides in accordance with supply of tools, equipments, tackles, man power etc including, cutting, grinding, 6 levelling, radiographically welding, testing of pipe lines, cleaning & painting to inner and outer surface of pipe, & all other incidential works to complete the job as per approved drawing or as per instructions of site Engineer with all labour, material, T&Ps, loading , leading, unloading, handling, rehandling, lowering, lifting, crossing of any nallah, track or any type of obstructions, taxes, octroi etc. complete job.(Nothing extra will be paid on this account what so ever the case may be).
Operation and Maintenance of 950 KLD Capacity Sewage Treatment Plant based on MBBR or FBBR Technology including providing of Manpower Supply of Chemicals and Electrical Repair and Maintenance at IIITDM Kancheepuram
Operation and Maintenance of 950 KLD Capacity Sewage Treatment Plant (STP) based on MBBR/FBBR Technology, including providing of Manpower, Supply of Chemicals, and Electrical Repair & Maintenance at IIITDM Kancheepuram
LAYING OF 100 MM DIA DI W.S PIPE LINE FROM 228/1 TO 145 BRIJI WEST IN WARD NO 110.
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 2. Supplying, fitting and fixing in position G.I. pipes of TATA make for underground works with all necessary accessories,specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately) (ii) 20 mm dia. medium quality
Design and Construction of 0.6 MLD Sewage Treatment Plant based on constructed wetland or root zone treatment technology and allied works at IIT Gandhinagar, Palaj, Gandhinagar in EPC Mode 1Design and Build Basis
Water Proofing Treatment work of Govt. Resi. Qtrs. in Sect. No. 25 under Jail-3 Sub Division, PWD Bhopal
Water Proofing Treatment work of Govt. Resi. Qtrs. in Sect. No. 25 under Jail-3 Sub Division, PWD Bhopal
Design construction supply erection and commissioning of Sewage Treatment Plant with a capacity of 1 MLD ASP Technology Manamadurai municipality along with Ten years of O and M on DBOT basis
Supply & Laying of pipe line for distribution treated sewage disposal From STP to the near by water body as per TNPCB norms with NGT guidelines