Loading…
Loading…
14,868 results • Best match
Providing and laying of water proofing treatment work over roof of PH1 3x105MW PH3 PH4 THP MPPGCL Sirmour Deolond Jhinna.
Non UCSR Item - Removing and cleaning the exciting waterproofing laying including dust clirt and all loose particles from the surface of the roof construction joint by cropping and then applying modified polymer motor to make the surface good free from local depression /unclulations and to the level of the rain water pipes there after providing and link a court of solvent based bitman primer of Dr fixit make @ 325 sqm per litre over the cleaned exciting surface and length 3 mm thick APP (Atactric poly propylene polymer) membrance of Dr. fixit make or torch shield or super the rmolay or equivalent over the primed surface and same shall be ficed firmed with the help of a gas furner i/c 100 mm over laping at the joints in all direction if required. No extra payment shall be made for over lapings. the joints shall be reated properly by heating and trawling to make the surface water light. The treatment shall be properly sealed as per instruction direction of Engineer in Charge - The guarantee period shall be 5 years from the completion date any seapage/leakage observed at treated surface work, it shall be attended by the firm/contractor at his cost. (Base rate 321.78 Sqm.)
Provision of water proofing treatment on the roof of Old Art Faculty Building at KUK (Recalled Societies and contractors)
[28.23]Providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having Sun Reflectivity Index (SRI) of 105 on top of concrete roof in three coats @10.76 litre/ 10 sqm One coat of self-priming of elastomeric waterproofing liquid (dilution with water in the ratio of 3:1) and two coats of undiluted elastomeric waterproofing liquid (dry film thickness of complete application/system not less than 500 microns). The operation shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes, complete in all respect as per the direction of Engineer-in-Charge. [Through Rate]
Repair/ Renovation/ water proofing Treatment to 1.00 lac gallons OHT at Sector F (Old) Sainik Colony under Own Source
Providing and applying crystalline mortar by mixing in the ratio of 4.5 :1 (4.5 parts crystalline mortar : 1 part water) for the treatment of faulty construction joints, cracks, tie rod holes and spalled honey combed surface of RCC under ground structures like basement, water tanks,bridge deck etc. to ensure water tightness. The crystallie mortar shall conform to the EN 1504-3 having compressive strength Class R4 > 45 MPa and adhesive bond strength Class R3 > 1.5 MPa. The work shall be carried out all complete as per specification and the direction of the Engineer-In-Charge. The product performance shall carry guarantee for 10 years against any leakage.For sealing cracks and faulty construction joints, routed out/making U-shape groove size 25x25mm and then primed the area with integral crystalline slurry @0.05kg/ running metre and while the surface is tacky filled the groove upto surface with crystalline mortar @1.50kg/ running metre. Once crystalline mortar is touch dry then finally applied two coats of integral crystalline slurry 0.05kg /runningmetre per coat.
Providing Services of Private vehicles for the office of Hon Minister WRD Konkan n Tapi Corp, under the control of Executive Engineer, MSDD, Kalwa, Thane debit to Executive Engineer, Lift Irrigation n Construction Div, Jalgaon for Period of One Year.
Providing Services of Private vehicles for the office of Hon. Minister W.R.D (Konkan & Tapi Corporation), the operation of Private vehicle will be under the control of Executive Engineer, Mechanical store and Development Division, Kalwa, Thane debit to Executive Engineer, Lift Irrigation & Construction Division, Jalgaon (Maharashtra State) for Period of One Year
Supply of Man Mazdoors for Operation and Maintenance of Thota Venkatachalam Pushkara Lift Irrigation Scheme Main Canal from Km:69.145 to Km:97.100 and its Distributories during Khariff season, 2026-27 for the period 4Months
Design, Supply, Transportation, Construction, Installation, Testing, and Commissioning of Sewage Treatment Plant at Dhakuakhana MB -1.5 MLD in ASP with Co-treatment of Faecal Sludge for 6 KLD and Rangapara MB -1.0 MLD in WSP on DBO
Design, supply, laying, hydro-testing, and comissioning of Raw Sewerage Main line for STP for required length which includes RISING MAIN, GRAVITY MAIN and Manhole Chamber (Bricks & RCC) for 4.2 KM including excavation in trenches, dismantling of all type of pavements, sand bedding as required, backfilling of trenches and foundations with approved grade excavated materials and approved graded river sand as required including loading and unloading , Shuttering and shoring the earth at different levels in foundations where necessary with required prop, struts, planks, timbers, nails etc. including dewatering and road restoration, hydro-testing complete for I&D system as per Technical Specifications and direction of Engineer/Employer.