Loading…
Loading…
15,443 results • Best match
REPAIR/ REPLACEMENT TO DAMAGED ROLLING SHUTTER, ROOF SHEET, ATT, WPT AND REHABILITATION OF INTERNAL DISTRESSED CONCRETE MEMBER AND OTHER CONNECTED ITEMS, JOINERY, FLOORING, SANITATION AREA FOR DEPOT AREA AT GHATKOPAR UNDER GE (NW) BHANDUP
Supply only integral water proofing compound ISI Marked complete all as specified and directed.
Request for Proposals for Services Request for Proposals for Project Management Services Including surveying, Project Management Consultant estimating, Construction Supervision Services for Palasava village of Rapar taluka estimating,Construction ... for Drainage line ... designing, Drainage line ...
Regarding the work of laying a new drainage line using the pushing method for the newly upgraded Wadaj crematorium in the Sardar Patel Stadium ward of the West Zone.
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped
PROVIDING IRRIGATION FACILITY BY DRILLING BOREWELL TO LAND OF SMT KARIYAMMA CO RANGASWAMY OF HARTHIKOTE VILLAGE AND SRI T.SHIVANNA BIN THIPPERANGAPPA OF ANESIDRI JAVANAGONDANAHALLI VILLAGE IN HIRIYUR TALUK, CHITRDURGA DIST ( RESERVED FOR 2A CATEGORY ONLY)
PROVIDING IRRIGATION FACILITY BY DRILLING BOREWELL TO LAND OF SMT KARIYAMMA CO RANGASWAMY OF HARTHIKOTE VILLAGE AND SRI T.SHIVANNA BIN THIPPERANGAPPA OF ANESIDRI JAVANAGONDANAHALLI VILLAGE IN HIRIYUR TALUK, CHITRDURGA DIST ( RESERVED FOR 2A CATEGORY ONLY)
PROVIDING IRRIGATION FACILITY THROUGH BOREWELL TO SY NO 161/3 TO THE LAND OF SMT SHAMABAI W/O SHANMUKH KORE OF NARONA VILLAGE IN ALAND TALUKA KALABURAGI DISTRICT UNDER SCP FOR THE YEAR 2025-26.
PROVIDING IRRIGATION FACILITY THROUGH BOREWELL TO SY NO 161/3 TO THE LAND OF SMT SHAMABAI SHANMUKH KORE OF NARONA VILLAGE IN ALAND TALUKA KALABURAGI DISTRICT UNDER SCP FOR THE YEAR 2025-26.
Maintenance and operation of sewer lines and drainage of water by removing silt from sewer lines with super sucker machines Including repair of sewer lines and manhole.
Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...