Loading…
Loading…
14,605 results • Best match
Water Proofing Treatment on roof of Govt. Resi. Qtrs. in Sect. No. 22 under Jail-3 Sub Dn, PWD Bhopal 2nd Call
Water Proofing Treatment on roof of Govt. Resi. Qtrs. in Sect. No. 22 under Jail-3 Sub Dn, PWD Bhopal
Laying of 400mm dia NP-3 Storm water pipe drain in Malibu Town Sector-47, Ward No.11, Division-1B under MCG.
Repair of damaged household Water Supply connection existing line (Including GST)
Improvements to Water Supply Infrastructure and Providing Under Ground Sewerage System in Maddur Municipality under NAGARABHIVRUDHI grants
Providing Laying and Jointing of distribution Pipe line with HDD machine and other associated works at industrial area SEZ-II, Jaipur
Horizontal directional drilling (by trenchless technology) of suitable dia hole minimum 1.0 mtr below natural ground level in all type of soil under CC/BT roads and pulling HDPE pipes of dia from 110 mm to 200 mm, which are available in the form of a coil/straight length of 3 or 6 mtr including excavation, shoring/ strutting, preparation, maintain the thrust and including, road dismantling, excavation and refilling of drive pit and exit pit, restoration of road cut as per technical specification and scope of work, but excluding the cost of pipe line. For Laying Pipe line 160 mm and 200 mm HDPE Pipe
Detailed Design, Drawing, Construction, Supply, Installation, Testing and Commissioning of 260 KLD Sewage Treatment Plant (STP) based on MBR Technology to be Installed at Transit Accommodation Odina Sumbal Bandipora on Turnkey Basis
Design, Supply, Installation, Testing and Commissioning of Sewage Treatment Plant (STP) based on MBR Technology as per the NIT for Transit Accommodation Odina Sumbal Bandipora on Turnkey Basis with total sewage handling capacity of 260 KLD. STP shall include necessary chemical dosing as required by the manufacture’s design. Additionally, provision for optimum heating / thermal insulation (as per requirement) of the sewage water during winter to ensure that the STP remains operational at ambient temperatures as low as -10℃ shall be in the scope of the firm.
Design construction supply erection commissioning Sewage Treatment Plant STP with a capacity of 2.00 MLD at Tittakudi Municipality along with Ten years of Operation and Maintenance on Design Build Operate and Transfer DBOT Basis
Supply & Laying of pipe line for distribution treated sewage disposal From STP to the near by water body as per TNPCB norms with NGT guidelines