Loading…
Loading…
15,357 results • Best match
Estimate for Providing and laying 450mm dia RCC NP-3 Pipe and 300mm dia S.W. Pipe Sewer line and Providing and laying 150mm dia K-9 D.I. Pipe and 100mm dia PVC Pipe Water Supply line at Dabua Village in ward No.11, NIT Faridabad.
Estimate for Providing and laying 450mm dia RCC NP-3 Pipe and 300mm dia S.W. Pipe Sewer line and Providing and laying 150mm dia K-9 D.I. Pipe and 100mm dia PVC Pipe Water Supply line at Dabua Village in ward No.11, NIT Faridabad.
Providing and laying water supply pipe line from Channapatna circle to M Hoskoppalu in Hassan CC Limits
Providing and laying water supply pipe line from Channapatna circle to M Hoskoppalu in Hassan CC Limits
Civil and Interior work, plumbing work, Electrical works, Furniture etc
Estimate- Work of Reception area & Coffee shop
Civil and Interior work, plumbing work, Electrical works, Furniture etc
Emergent Protection work for L/S bank of Mej River near Gendoli lift irrigation Project
Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With lead beyond 250 m and up to 750 m (½ Km)
Emergent Protection work for L/S bank of Mej River near pholai lift irrigation Project
Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With lead beyond 250 m and up to 750 m (½ Km)