Loading…
Loading…
15,361 results • Best match
Annual Maintenance Estimate for Operation & Maintenance of Tadipudi Lift Irrigation Scheme Sub Lift-I at Km 5.175 of Tadipudi Lift Irrigation Scheme Main Canal in Surayyapeta(V), Tallapudi(M), in East Godavari District for the period 12 MONTHS from 01.06.2026 to 31.05.2027 or from date of agreement to 31.05.2027
Repair and Reconditioning of 1250 HP VT motor at Kathora lift irrigation Scheme Stage-I Mandleshwar Distt- Khargone (M.P.)
Repair and Reconditioning of 1250 HP VT motor at Kathora lift irrigation Scheme Stage-I Mandleshwar Distt -Khargone (M.P.)
Custom Bid for Services - OPERATION AND MAINTENANCE OF EFFLUENT TREATMENT PLANT Similar Category Operation and Maintenance of Effluent/Sewage Treatment Plant
Custom Bid for Services - OPERATION AND MAINTENANCE OF EFFLUENT TREATMENT PLANT Similar Category Operation and Maintenance of Effluent/Sewage Treatment Plant
As per BOQ
Supply only Liquid water proofing compound all as specified and directed.
Annual O and M of automatic Drinking water bottling plant with an hourly production capacity 3600 bottles per hour of 1000 ml/ 500 ml at Dejuri water treatment plant of surface water based water supply scheme under Bankura Sadar Sub-Division,
Production of packaged drinking water on 8 hours per shift basis of R.O. based fully automatic drinking water bottling plant with an hourly Production capacity 3600 bottles of 1000 ml/500 ml capacity at Dejuri Bottling Plant in the district of Bankura. by providing sufficient skilled machine operator for pet Blowing machine (1 No.), Rinsing filling capping machine (1 No.), labeling machine & batch code machine (1 No.), shirnk wrapping machine (1 No.), water treatment plant (1 No.), High pressure Compressor, Low pressure Compressor, Chiller and Cooling tower (1 No.). Assistant operator cum helper for despatch of finished product to ware house (1 No.), skilled person for Stock keeping aranging of finished product at ware house upto delivery point and data report generation through automation system (1 No.) Security guard (1 No.) per shift including providing necessary personnel for guarding arrangement round the clock. The Agency will provide sufficient man power for smooth operation security of the bottling plant as directed by E.I.C. This does not include any spares and raw materials for operation and maintenance of the bottling plant. (Including ESI and EPF as per govt norms). Note:-Minimum production of 500 ml prandhara bottles should not be less than1.5 lakh per year.
Water Quality Mitigation to WSS - 2023-24 PRESSURE SAND FILTER REFILLING IN PADANNOTTE WSS IN MUNDERI GP and PRESSURE SAND FILTER /IRP of Dual Media filter at Moilothara WSS in Maruthomkara GP Kannur and Kozhikode District
Design Supply and installation, Trial run and Commissioning (based on site conditions and as directed by the Engineer in Charge) of Pressure sand FILTER/IRP of Dual Media filter-Anthracite and special grade fine sand /quartz sand silex and pebbles for Maruthomkara GP Moilothara WSS WITH Suitable Technology option using Mild steel PRESSURE Vessel with FRP lining, Butterfly valves with complete base media and shall be complete with face piping ,fittings valves filter media, under bed plate fitted with strainer pressure gauges cocks .manhole hand hole air vent system manufactured with good engineering, practice having minimum thickness of 5mm with manhole and cover for easy inspection and an opening provision for media removing arrangement at bottom side with dummy arrangement and painting the vessel with epoxy paint two coats over two coat of primer finishing with synthetic enamel paint capable of discharging water at 6000 LPH with a capacity to withstand the operating head of 120 m with best quality ISI MARKED Butter fly valves for easy backwashing rinsing and filtering with all necessary high quality filter media with sufficient capacity capable of removing Turbidity of water two times as per the water quality test report of 4 NTU TO THE PERMISSIBLE LIMIT AS PER BIS drinking, water quality standard .All auxiliary including fittings nuts and bolts shall be made of MS with epoxy paint. The filter may be installed in the pumping main /Distribution main near tank site in order to make the operation and maintenance easy. The life period of the filter media supplied should be of minimum 3 years and the total head loss due to PSF SUPPLIED SHOULD NOT BE MORE THAN 4M . The PSF SHOULD BE DESIGNED with a capacity to withstand 1.5 times of the above given parameters of discharge and head. The technical details of the filter unit including the complete dimensions and type of filter media used shall be annexed and include the Flow diagram, Submitting Water quality test report from KWA after commissioning of the Scheme, submitting of Operation and Maintenance manual with guidelines for troubleshooting shall also be provided and including water quality test and Labelling.The GP OFFICE BEARERS shall be given Training for the Operation and MAINTENANCE of the Plant. All civil mechanical and plumbing works by connecting to the existing pumping main with suitable size and specials required to deliver water reservoir to the using existing pump Operation and maintenance manual with guidelines for troubleshooting shall also be provided after commissioning of the filter.(2 Nos) Housing for filter units The housing arrangements should be as follows *The columns shall be on RCC foundations *Height of roof to be based on plant, and provide sloping roof *Rafters and purlins *Pre coated sheets of 0.5mm thickness to cover from top sheet only *All other sides shall be covered with mesh wire cage (size 1”x1” with gauge 1/8” fitted in angle iron 35x35x5MM duly painted with good quality paint )with a suitable opening having locking arrangement. The floor shall consist of 40mm thick concrete, The finished floor level of the treatment plant should be as per site condition with minimum of 60 cm higher than the natural ground level. The plinth protection shall be 0.15m higher than the Natural level ie the floor level of the water treatment plant will be 0.45m above plinth protection. A 1.0m wide plinth protection sloping to outside with cement concrete/interlocking pavers mix M135 with a thickness of 50 mm shall be provided all round the shed foundation. Suitable /necessary foundation for pumps and filters shall be provided.