Loading…
Loading…
15,966 results • Best match
MAINTENANCE OF BR-VIII OFFICE SITUATED AT 172/5 R.B.AVENUE KOLKATA-700029
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 1. Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union,... socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all ...
SPL REPAIRS REPLACEMENT OF WATER PIPE LINE, VALVES AND CONNECTED WORKS AND REP TO RUNWAY CONTROLLERS HUTS AND ANXILLARY BUILDINGS AT AFS TAMBARAM
Supply and lay 3 layer PP-R (Polypropylene random copolymer) pipes SDR 7.4 & SDR 11UV stablised and antimicrobial fusion welded having thrmal stability for hot & cold water supply all PP-R plain & brass threaded polypropylene fittings compete laid in trenches of size of outer dia 110mm pipe complete all as specified and directed by Engineer-in-Charge.
Operation and Maintenance of total Distribution system, Pipelines (CI/DI/AC/UPVC) inclusive of any augmentation / rejuvenation / Special repair of scheme with repairing of valve chambers at Jamalpur and Moukhali W/S Scheme ...
Operation & Maintenance of total Distribution system, Pipelines (CI/DI/AC/UPVC) inclusive of any augmentation / rejuvenation / Special repair of ...
REPAIRING AND MAINTENANCE OF PARK AND CONSTRCUTION OF PATHWAY,PROVIDING AND FIXING OF GYM EQUIPMENTS AND OTHER DEVELOPMENT WORKS AT TANKI WALA PARK ARVIND VIHAR W-55 Z-13
1000030952-FLUSHING AND CLEANING OF BOREWELL
PROVN OF DEFI OFFRS JCOs and ORs MD ACCN AT SUKNA UNDER GE (P) SILIGURI
... volt meter 0-500 Volt with 01 No. (vi) LED indication lamps (3 Nos) with holder for main supply indication RYB-01 Set. (vii) Astro Timer switch with 3 pole 415 Volt, with coil operating ...
Construction of CWSN at Middle School Peth Dreygam Budgam
Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes conforming to IS: 15801, UV stabilized and anti-microbial fusion welded, having thermal stability for hot and cold water supply including all PP-R plain and brass threaded Polypropylene random fittings. This includes testing of joints complete as per direction of Engineer-incharge.Internal work-exposed on wall with clamps at 1.00 meter spacing