Loading…
Loading…
Tender Value
₹2.1 L
EMD Value
₹4,260
Closing Date
13 Jul 2026, 4:00 pm5d left
Executive Engineer RnB Division Budgam
Engineering complex Budgam
Construction of CWSN at Middle School Peth Dreygam Budgam
2026_PWDJK_314633_2
NIT_No_45_MD_ 2026-27
Open Tender
Civil Works
40 days
Dreygam
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer RnB Division Budgam
₹4,260
4 Jul 2026
4 Jul 2026
14 Jul 2026
4 Jul 2026
13 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:50 meter beyond 1 m from cutting edge,All kinds of soil | 11.35 | cum | 673.3 | ₹7,641.95 |
| 2 | Providing and laying in position stone soling using Nallah stone including all leads, lifts and carriages complete job. | 1.46 | cum | 1,000 | ₹1,460 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.94 | cum | 5,202.9 | ₹4,890.73 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2.59 | cum | 6,591.25 | ₹17,071.34 |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 6.4 | cum | 7,571.55 | ₹48,457.92 |
| 6 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor v level | 3.37 | cum | 1,455.65 | ₹4,905.54 |
| 7 | FORM WORK
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, buttresses, plinth and
string courses etc. | 5.11 | sqm | 628.95 | ₹3,213.93 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconi. and access platforms. | 8.29 | sqm | 718.2 | ₹5,953.88 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.98 | cum | 7,788.4 | ₹15,421.03 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 184.44 | Kg | 123.2 | ₹22,723.01 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_1018830.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid