Loading…
Loading…
15,953 results • Best match
Operation and Maintenance of distribution system including rising main, FHTC, OHR deployment of man power, checking of status of supply in the command area, reparing of leakages, busting pipe line including round the clock watch ward to ensure
... system including rising main, FHTC, OHR & deployment of man power, checking of status of supply in the command area, reparing of leakages, busting pipe line including round the clock watch & ward to ensure supply of potable water through out the command area of the scheme in all respect and as per ...
Operation and Maintenance of distribution system including rising main, FHTC, OHR deployment of man power, checking of status of supply in the command area, reparing of leakages, busting pipe line including round the clock watch ward to ensure
... system including rising main, FHTC, OHR & deployment of man power, checking of status of supply in the command area, reparing of leakages, busting pipe line including round the clock watch & ward to ensure supply of potable water through out the command area of the scheme in all respect and as per ...
Redrilling of Existing Borewells and Installation of Motor starter near Durugamma Temple and Narendra House and Eshappa House in Ward No 12 and Purchasing of Diesel Engine Water Pump to IR for Drinking water purpose Turvihal Town
Redrilling of Existing Borewells and Installation of Motor starter near Durugamma Temple and Narendra House and Eshappa House in Ward No 12 and Purchasing of Diesel Engine Water Pump to IR for Drinking water purpose Turvihal Town
Construction of 96 Units Type III quarters at Jogeshwari on Mumbai Division of Western Railway in Mumbai
Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc. by applying cement slurry mixed with water proofing cement compound as per IS 2465 in layers a) 1 layer of slurry of cement @0.488kg/m2... compound as per IS 2465 in layers a) 1 layer of slurry of cement @0.488kg/m2 mixed with water proofing cement compound @0.253 lit/m2, allowed to air cure for 4 hours.b) 2 layer of ...
Construction of Precast RCC Drain and Providing and laying M.S. Pipeline by Jack pushing technology at Shamnath Marg From Civil Lines Metro Station Gate No 1 to Ganpati Apartments under Sub Division-4 of Division (C and ND)-Roads during 2025-26.
Carrying out subsurface survey at above mentioned across the road showing Water supply Pipelines, Sewer lines, Telecom Cables, Communication lines, drains , Gas Pipe Lines, Anchors, Oil Pipe Lines, Electric Cables, & other conduits etc. in the proposed corridor along with providing ...
SPL REPAIR TO BLDG NO P-49 (04 QTRs) JCOs MD ACCN OF 4 ASSAM AND SPL REPAIR FOR PERIMETER WALL OF OLD MH PARALLEL TO CAMBRIDGE ROAD UNDER GE (I) KANPUR
Taking down existing sunken portion treatment by demolition of old concrete and tiles and carry out the sunken treatment as in following steps given below and as directed by the Engr-in-charge:- (a) S&F drainage spout pipe GI 40 mm dia bore light grade upto outside of outer wall (Approx 450 mm to 600 mm long) ...