Loading…
Loading…
15,953 results • Best match
Setting up of Flatted Factory Complex at Chabua, Dist. Dibrugarh
COLD AND FLUSHING WATER SUPPLY (INTERNAL): Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps ...
SPECIAL REPAIR TO MARRIED ACCOMMODATIONS IN VARIOUS BUILDING AT DEFENCE LABORATORY JODHPUR
M&L for water proofing roof treatment as under :- (i) Surface preparation : The surface to be treated should be sound and free... geotextile membrane dipped in PU liquid Membrane before the 1st coat application. (iii) Water proofing membrane : S&F Waterproofing membrane: Supplying and applying water-based ,single component UV resistant elastomeric PU liquid membrane coating applied with ...
Miscellaneous Minor Capital Civil works in Terminal Building, ATS Complex and non-operational area of Surat International Airport, Surat.
Providing and applying integral crystalline slurry of hydrophilic innature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio ...
Annual Maintenance Contract of New Building for Rajasthan High Court, Jodhpur (2026-27)
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes (IS 15778 : 2007 code) having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1 metre spacing. This includes jointing of pipes & fittings with one step ...
Construction of Boundari wall,barahdari work and other development work at Veer Tejaji Nagar Shiv Temple
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...
PROVN OF WATCH TOWER SATCOM LAB AND ALLIED WORKS AT AF STN VADSAR
S & F Single Pipe for RISER Water Supply Branch pipeline fixing done with Pipe Supporting Clamping System consists of Mono Bracket + U Bolt R/M System - Water Supply Down take single pipe 3/4" UPVC pipe running horizontally wall distance 2" Pipe Support Clamping made of : 1. Mono Bracket ...