Loading…
Loading…
15,953 results • Best match
REMOVAL OF CHOKAGE BY REPAIRING S.W PIPE LINE AND ANCILLARY WORKS AT DIFFERENT PLACES IN WARD NO.-075
SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(ii) 225 mm
The building is a double storied building (Ground floor and First floor)having an area of 2149 m2.The Ground floor consist of 2 Examination Halls, IT Room, Online Valuation room, Office, Toilets, AHU, Electrical Room , Lobby and Passage , etc.
22.23.1:Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in ...
Operation and Maintenance of distribution system including rising main, FHTC, OHR deployment of man power, checking of status of supply in the command area, reparing of leakages, busting pipe line including round the clock watch ward to ensure
... system including rising main, FHTC, OHR & deployment of man power, checking of status of supply in the command area, reparing of leakages, busting pipe line including round the clock watch & ward to ensure supply of potable water through out the command area of the scheme in all respect and as per ...
Installation of CCTV, Access Control System and FMS
Maintenance of Water Supply
M/R to Govt. Resdl bldgs at Altinho. S.H Repair and renovation to E- 19 qtrs at Altinho, Panaji.
Providing and fixing chlorinated ployvinyl chloride (CPVC) pipes confirming to IS:15778 having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipes with clamps at 1 mt. spacing. This includes jointing of pipes and fittings with one ...
Under District Ayodhya, Construction Work Of 250 Capacity Boys Hostel At Main Campus Of Acharya Narendra Dev University Of Agriculture And Technology At District Ayodhya (U.P) ,Lot No 1
Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio ...