Loading…
Loading…
15,953 results • Best match
Request for Proposal (RfP) for Design, Engineering, Procurement and Construction of a Sanitary Landfill Facility (SLF) at Morbi including Comprehensive Operation & Maintenance for a Period of 6 Years
block, water supply, waste water
Comprehensive maintenance for Civil and EnM works in NSCH Colony for a period of 08 months.
Part E (Manpower) Day to day maintenance of water supply net work and plumbing work etc. with all labour cost but excluding cost of materials as per instruction of Engineer Incharge. (1 skilled and 1 unskilled labour per shift for 02 shift) Scope: on daily basis in 02 shift.
CLEANING AND OTHER ALLIED WORK OF STATION CAMPUS AT STATION NO 4 UNDER TPS.
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 19(1) Supplying, fitting and fixing PVC pipes of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS: 1239 (Part - I). with all necessary accessories specials viz. socket, bend, ...
GREEN CORRIDOR YOJNA VIKAS MEIN BADHAK BADE HARE VRIKSHO KO ANNYA ESTHAAN PAR PRATIROPIT KARNE EWAM 1 YEAR ANURAKSHAN KA KARYA
Transplantation of trees with in a distance of 2km including excavation around existing tree, pruning of branches, lifting, loading and transportation of existing tree, digging pits for placing tree at new... should be firmly secured to the stake so as to prevent excessive movement, flooding with water, treatment of roots, rope and gunny bags as per direction of the officer incharge. T&P and all required ...
Construction of Drinking Water Facility (Boaring Work, Drinking Water and Hand Washing Facility in CHC Sadar Prakhand Godda, GP-Godda Nagar and PHC Sarauni, GP - Sarauni under Block - Godda, District - Godda
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings and fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
Cleaning of Open Strom Drain Nallah Covered drains in HEEP
CLEANING OF OPEN STORM WATER DRAINAGE OF 2 SQM TO 4 SQM CROSS SECTIONAL AREACLEANING OF OPEN STORM WATER DRAINAGE OF 2 SQM TO 4 SQM CROSS SECTIONAL AREA OR COVERED STORM WATER DRAIN, OPEN NALA, CULVERTS ETC. AT VARIOUS LOCATION (INSIDE/ OUTSIDE PLANT PREMISES) ...