Loading…
Loading…
15,939 results • Best match
Construction of Site Office Dhuriyapar GIDA Gorakhpur
WATER SUPPLY (INTERNAL & EXTERNAL WORK ) Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps ...
CWEK-____/969 EWS/2026-27 PROVN OF ACCN FOR MI ROOM WITH AMBULANCE GARAGE AT HAWAS GULMARG UNDER GE 969 EWS
Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS listed in Schedule 'A' Part-VI (Section-I) brought forward from serial page No. 33
Construction of Precast RCC drain and Footpath on 100 Foota Road (ID-1187) from Nanda Pump House (SSN Road) to Anuvrat Marg culvert via Phool Mandi cut under PWD Division South Road-1.
Diverting drain water/effluent from existing drain by excavating trench/providing RCC pipes of required size/by pumping arrangements for the purpose of construction of new drain... without clot, by mechanical/manual means in layers not exceeding 20 cm in depth, proper watering and leveling with proper compaction etc. all complete and as per direction of Engineer-in-Charge. ...
Leasing for Bianpur Rest House Distt Gurdaspur
Desilting and removal of Excess River bed material from Beas Chakki River near village Sidhpur Bianpur in District Gurdaspur
Construction of Flood Mitigation Structure such as Geo Textile bags Pitching along with series of stone spall crated studs in between RD 5000 to 6000 of River Sutlej Creek in Tehsil and District Fazilka to save adjoining abadies
Supply of boulder stone as per departmental specifications i/c digging,collection, all taxes, loading, unloading, stacking and including carriage from Govt. approved quarry to stackyard and recarriage if any From Stackyard to site of works.