Loading…
Loading…
1,00,389 results • Best match
Provision of water proofing treatment at Examination Building, SDC, University of Delhi
Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc consisting of following operations: (a) Applying a... operations: (a) Applying a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with water proofing compound conforming to IS. 2645 and approved by Engineer-in-charge over the ...
Laying Pipe Line For Drinking Water Supply With Over Head PVC Tank in Educational Institution For Uttar Hallyan ICDS at Uttar Hallyan Under XVFC Tied fund ID 109409189 of 2025 26
Laying Pipe Line For Drinking Water Supply With Over Head PVC Tank in Educational Institution For Uttar Hallyan ICDS at Uttar Hallyan Under XVFC Tied fund ; ID : 109409189 of 2025-26
Laying Pipe Line For Drinking Water Supply With Over Head PVC Tank in Educational Institution For Chhayani Nayekpara ICDS at Chhayani Purba Under XVFC Tied fund ID 109408040 of 2025-26
Laying Pipe Line For Drinking Water Supply With Over Head PVC Tank in Educational Institution For Chhayani Nayekpara ICDS at Chhayani Purba Under XVFC Tied fund ; ID : 109408040 of 2025-26
Laying RCC NP3 Pipe Line 900 mm Dia for Dewatering of flood water and save Abadi in village Mundsa connected with 500 mm dia HDPE pipe line with Pump House and outfalling into Ditch Drain along JLN Feeder near RD 306000/R.
Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISI marked HDPE pipe of 500 mm outer dia of PE-80 grade and PN-4 for water supply as per IS 4984-2016 (amended up to date) in trenches in complete including cost of HDPE ...
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; Operation and maintenance of STP plant Complete System OEM or experienced firm Functional under Warranty but outside AMC; Operation and maintenance of STP plant Compl.., ... Effluent/ Sewage Treatment ... Effluent/Sewage Treatment Plant ... Treatment Plant - ... ETP plant Complete ... ETP plant Compl..
Operation and Maintenance of Effluent/Sewage Treatment Plant | Billing:quarterly | Amount:720000
PROVISION OF SEWAGE NETWORKS FOR OTHER THAN MARRIED ACCOMODATION AND DWARKA VIHAR WITH ALLIED SERVICES TO CONNECT EXISTING SEWAGE TREATMENT PLANT AT GNR MIL STN
Material and labour Ductile Iron Air valves with two air Outlets, 50mm dia bore and fixing Up in ductile iron water supply mains