| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 CrAdmitted-Finance | ₹7.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.4 Cr+₹42.5 L (6.09%)Admitted-Finance | ₹7.4 Cr+₹42.5 L (6.09%) | L2 | Admitted-Finance |
| 3 | L3₹8.2 Cr+₹1.2 Cr (17.8%)Admitted-Finance | ₹8.2 Cr+₹1.2 Cr (17.8%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical 70 VARDHMAN NAGAR A P O SHYAM NAGAR AJMER ROAD JAIPUR PIN 342019 | JAIPUR | 342019 | - | - | Rejected-Technical Not Admitted due to firm has not submitted details of past experience of similar nature as per Para 8 (c) of NIT. |
| Sl No | Description | Qty | Unit | M/s Matadeen Ramchandra Agarwal L1 | AMIT ASSOCIATES L2 | M/s R.L.PAREEK L3 |
|---|---|---|---|---|---|---|
| 1.00 | Material and labour for Earth work in excavation all kind of Soil by mechanical means (Hydraulic excavator)/ in foundation trenches or drains or sewer line (not exceeding 1.5 m in depth and not exc 1.5mtr width ), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m as directed by Engineer-in-charge.
Note: Any damage done to the existing services i.e. underground electric wiring/sewer lines/water pipe /drains and roads/paths/fencing/wall during the excavation of work shall be rectified immediately by the contractor without any extra cost. | 20,088 | CUM | 216 ₹43,39,008 | 167 ₹33,54,696 | 80 ₹16,07,040 Lowest |
| 2.00 | Material and labour for Earth work in excavation all kind of Soil by mechanical means (Hydraulic excavator) means over areas (exceeding 30cm in depth and exc 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.
Note: Any damage done to the existing services i.e. underground electric wiring/sewer lines/water pipe /drains and roads/paths/fencing/wall during the excavation of work shall be rectified immediately by the contractor without any extra cost. | 3,123.76 | CUM | 207 ₹6,46,618.32 | 208 ₹6,49,742.08 | 80 ₹2,49,900.8 Lowest |
| 3.00 | Material and labour for Earth work in excavation all kind of Soil by mechanical means (Hydraulic excavator) means over areas (exceeding 1.5mtr in depth but not exc 3.0mtr & exc 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.
Note: Any damage done to the existing services i.e. underground electric wiring/sewer lines/water pipe /drains and roads/paths/fencing/wall during the excavation of work shall be rectified immediately by the contractor without any extra cost. | 8,695.4 | CUM | 225 ₹19,56,465 | 237 ₹20,60,809.8 | 90 ₹7,82,586 Lowest |
| 4.00 | Material and labour for Earth work in excavation all kind of Soil by mechanical means (Hydraulic excavator) means over areas (exceeding 3mtr in depth but not exc 4.50mtr & exc 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.
Note: Any damage done to the existing services i.e. underground electric wiring/sewer lines/water pipe /drains and roads/paths/fencing/wall during the excavation of work shall be rectified immediately by the contractor without any extra cost. | 5,441.98 | CUM | 252 ₹13,71,378.96 | 276 ₹15,01,986.48 | 90 ₹4,89,778.2 Lowest |
| 5.00 | Material and labour for Earth work in excavation all kind of Soil by mechanical means (Hydraulic excavator) means over areas (exceeding 4.5mtr in depth but not exc 6.0mtr & exc 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.
Note: Any damage done to the existing services i.e. underground electric wiring/sewer lines/water pipe /drains and roads/paths/fencing/wall during the excavation of work shall be rectified immediately by the contractor without any extra cost. | 2,166.91 | CUM | 306 ₹6,63,074.46 | 314 ₹6,80,409.74 | 105 ₹2,27,525.55 Lowest |
| 6.00 | Use and waste of timbering as planking and struting for excavation in Hydraulic excavator means over areas in soil exc 3.00mtr and not exc 7.50mtr deep ,including wales,sewer pipes, struts ,open polling boards, etc as may be necessary and fixing and removal complete all as specified and as directed | 24,410 | sqm | 207 ₹50,52,870 Lowest | 209 ₹51,01,690 | 625 ₹1,52,56,250 |
| 7.00 | Use and waste of timbering as planking and struting for excavation in Hydraulic excavator means over areas in soil exc 3.00mtr and not exc 7.50mtr deep ,including shafts, wells, cesspits, manholes and pier holes etc as may be necessary and fixing and removal complete all as specified and as directed | 2,137 | sqm | 225 ₹4,80,825 Lowest | 230 ₹4,91,510 | 625 ₹13,35,625 |
| 8.00 | Material and labour for DWCPE Pipe (ISI Marked) 150mm dia of Class SN8 , double wall corrugated ,laid in trenches for sewer network , laid on and any depth fixed and jointed with and including integral socket or coupler and EPDM sealing ring and tested complete all as specified in IS 16098 : 2013 etc complete all as specified and as directed | 8,370 | RM | 333 ₹27,87,210 | 242 ₹20,25,540 Lowest | 550 ₹46,03,500 |
| 9.00 | Material and labour for DWCPE Pipe (ISI Marked) 200mm dia of Class SN8 , double wall corrugated ,laid in trenches for sewer network , laid on and any depth fixed and jointed with and including integral socket or coupler and EPDM sealing ring and tested complete all as specified in IS 16098 : 2013 etc complete all as specified and as directed | 2,592 | RM | 450 ₹11,66,400 | 395 ₹10,23,840 Lowest | 700 ₹18,14,400 |
| 10.00 | Material and labour for DWCPE Pipe (ISI Marked) 250mm dia of Class SN8 , double wall corrugated ,laid in trenches for sewer network , laid on and any depth fixed and jointed with and including integral socket or coupler and EPDM sealing ring and tested complete all as specified in IS 16098 : 2013 etc complete all as specified and as directed | 500 | RM | 756 ₹3,78,000 Lowest | 760 ₹3,80,000 | 900 ₹4,50,000 |
Tender Value
Refer Docs
EMD Value
₹6.5 L
Closing Date
9 Feb 2026, 6:00 pmClosed
CWE AHMEDABAD
CWE Ahmedabad Hanuman Camp Shahibaug Ahmedabad PIN-380003
PROVISION OF SEWAGE NETWORKS FOR OTHER THAN MARRIED ACCOMODATION AND DWARKA VIHAR WITH ALLIED SERVICES TO CONNECT EXISTING SEWAGE TREATMENT PLANT AT GNR MIL STN
2026_MES_748238_1
87486/E8
Open Tender
Civil Works
Item Rate
210 days
Army area
As per NIT
6 documents required · 6 mandatory
₹3,000
GE (A) GANDHINAGAR
₹6.5 L
Yes
18 Feb 2026
13 Jan 2026
11 Feb 2026
13 Jan 2026
9 Feb 2026
27 Jan 2026
13 Jan 2026 - 23 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and labour for Earth work in excavation all kind of Soil by mechanical means (Hydraulic excavator)/ in foundation trenches or drains or sewer line (not exceeding 1.5 m in depth and not exc 1.5mtr width ), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m as directed by Engineer-in-charge.
Note: Any damage done to the existing services i.e. underground electric wiring/sewer lines/water pipe /drains and roads/paths/fencing/wall during the excavation of work shall be rectified immediately by the contractor without any extra cost. | - | CUM | - | - |
| 2 | Material and labour for Earth work in excavation all kind of Soil by mechanical means (Hydraulic excavator) means over areas (exceeding 30cm in depth and exc 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.
Note: Any damage done to the existing services i.e. underground electric wiring/sewer lines/water pipe /drains and roads/paths/fencing/wall during the excavation of work shall be rectified immediately by the contractor without any extra cost. | - | CUM | - | - |
| 3 | Material and labour for Earth work in excavation all kind of Soil by mechanical means (Hydraulic excavator) means over areas (exceeding 1.5mtr in depth but not exc 3.0mtr & exc 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.
Note: Any damage done to the existing services i.e. underground electric wiring/sewer lines/water pipe /drains and roads/paths/fencing/wall during the excavation of work shall be rectified immediately by the contractor without any extra cost. | - | CUM | - | - |
| 4 | Material and labour for Earth work in excavation all kind of Soil by mechanical means (Hydraulic excavator) means over areas (exceeding 3mtr in depth but not exc 4.50mtr & exc 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.
Note: Any damage done to the existing services i.e. underground electric wiring/sewer lines/water pipe /drains and roads/paths/fencing/wall during the excavation of work shall be rectified immediately by the contractor without any extra cost. | - | CUM | - | - |
| 5 | Material and labour for Earth work in excavation all kind of Soil by mechanical means (Hydraulic excavator) means over areas (exceeding 4.5mtr in depth but not exc 6.0mtr & exc 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.
Note: Any damage done to the existing services i.e. underground electric wiring/sewer lines/water pipe /drains and roads/paths/fencing/wall during the excavation of work shall be rectified immediately by the contractor without any extra cost. | - | CUM | - | - |
| 6 | Use and waste of timbering as planking and struting for excavation in Hydraulic excavator means over areas in soil exc 3.00mtr and not exc 7.50mtr deep ,including wales,sewer pipes, struts ,open polling boards, etc as may be necessary and fixing and removal complete all as specified and as directed | 24,410 | sqm | - | - |
| 7 | Use and waste of timbering as planking and struting for excavation in Hydraulic excavator means over areas in soil exc 3.00mtr and not exc 7.50mtr deep ,including shafts, wells, cesspits, manholes and pier holes etc as may be necessary and fixing and removal complete all as specified and as directed | 2,137 | sqm | - | - |
| 8 | Material and labour for DWCPE Pipe (ISI Marked) 150mm dia of Class SN8 , double wall corrugated ,laid in trenches for sewer network , laid on and any depth fixed and jointed with and including integral socket or coupler and EPDM sealing ring and tested complete all as specified in IS 16098 : 2013 etc complete all as specified and as directed | 8,370 | RM | - | - |
| 9 | Material and labour for DWCPE Pipe (ISI Marked) 200mm dia of Class SN8 , double wall corrugated ,laid in trenches for sewer network , laid on and any depth fixed and jointed with and including integral socket or coupler and EPDM sealing ring and tested complete all as specified in IS 16098 : 2013 etc complete all as specified and as directed | 2,592 | RM | - | - |
| 10 | Material and labour for DWCPE Pipe (ISI Marked) 250mm dia of Class SN8 , double wall corrugated ,laid in trenches for sewer network , laid on and any depth fixed and jointed with and including integral socket or coupler and EPDM sealing ring and tested complete all as specified in IS 16098 : 2013 etc complete all as specified and as directed | 500 | RM | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.22 MB
TENDER.pdf
Tender Documents • 0.97 MB
BOQ_837928.xls
BOQ • 0.54 MB
Drawings.pdf
Additional Documents • 8.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .