Loading…
Loading…
1,01,529 results • Best match
Urgent repair of HIGH TENSION (HT) motor of pump No. 1 at 50 MLD Assonora Water Treatment Plant
Government eProcurement System Created By: Charles Desouza Created Date/Time: 29-Apr-2026 05:14 PM Tender Title: Urgent repair of HIGH TENSION (HT) motor of pump No. 1 at 50 MLD Assonora Water Treatment Plant Tender ID: 2026_DDW_28385_1
Design, Drawing, Const. Testing and Comm. of S/S, 610 KLD Sewage Treatment Plant (STP) and 11 Nos of 2.5 KLD Effluent Treatment Plant (ETP) inside Capital Hospital, Bhubaneswar including Operation and Maint. for a period of Five Years
Construction of STP & ETP Designing, drawing, supplying, constructing, testing & commissioning of Effluent Treatment Plant (ETP) & Sewage Treatment Plant (STP) of required capacity and appropriate technology (MBBR / SBR / MBR) including all ...
Providing, laying, jointing and testing of D.I. pipe K-7 to connect the existing sewerage network of ward No. 1,2,3,4 , 8 including construction of R.C.C. manhole chamber, R.C.C. pillars, flushing tank, inspection chamber, anchor block,
Excavation in foundation trenches for ( pipes and man holes upto all depths and in all classification of earth work such as; pick work, jumper work, blasting work, soft/hard rock and chiselling soft/hard rock where blasting is prohibited, cuttiings ...
WORK OF PROVIDING AND LAYING OF DWC DRAINAGE PIPE IN WARD NO.11 SAI VIHAR COLONY OF NAGAR PARISHAD RAU DISTT. INDORE(AS PER SCHEDULE)
WORK OF PROVIDING AND LAYING OF DWC DRAINAGE PIPE IN WARD NO.11 SAI VIHAR COLONY OF NAGAR PARISHAD RAU DISTT. INDORE(AS PER SCHEDULE) (DETAIL BOQ AS PER ATTACHED ESTIMATE AT PORTAL)
Repairing work of Gate s outlet and Structure s in selected portion on 1R 3R 4R 9R 10R and 11L of main canal under Dhapewada Lift Irrigation scheme Stage I
EPC-Turnkey for all engineering, procurement, construction, rehabilitation /replacement, integration, testing, commissioning and whatsoever required to render the Dehani Lift Irrigation Scheme fully operational and capable of delivering scheduled irr