Loading…
Loading…
1,01,529 results • Best match
Laying distribution 100mm Dia D.I. Pipe at B.M. Road(Akash Masala Gali) starting from Ho Putul Shaw to Ho Bharati in ward no 05 Booth no 86 sl no 1 under APAS
eProcurement System of Government of West Bengal hosted at WB-SDC Created By: SURESH MISHRA Created Date/Time: 30-Jan-2026 05:08 PM Tender Title: Laying distribution 100mm Dia D.I. Pipe Tender ID: 2025_MAD_5003285_2
REPAIR/MAINT OF SEWAGE PUMP SEWAGE TREATMENT PLANTS DG SETS OF VARIOUS CAPACITIES SERVICING AND MAINT EOT CRANE AND CONNECTED MISC E/M WORK AT ANAND PARBAT MIL STN UNDER GE N DELHI CANTT10
... colour after preparation of surface and writing letters and numbers complete of complete Sewage treatment plant capacity 100 Cum/day and 300 cum/day with equalization tank, Raw sewage pumps, MBBR reactor, Chlorine tank, filter feed pump, Dual media filters, RCC treated ...
REPAIR TO LAGGING OF INTERNAL WATER SUPPLY FITTINGS, SUNKEN TREATMENT, PLUMBING STAKS, TANK CLEANING AND REPLACEMENT OF OTHER B AND R MISC ITEMS OF MD/OTM ACCN AT JAK LI RC UNDER GE 970 EWS
M&L Lagging to pipes used in internal water supply (internal dia of pipe 20mm) or plumbing all round with,25min thick bonded mineral wool preformed ‘SNAP ON’ pipe sections of density 144 Kg/cum conforming to IS 9842 all as specified and directed by the Engr-in-Charge.
Laying of water Distribution Pipe Line at different locations at Ward no 22 and 23 under Siliguri water Supply Division PHE Dte.
Repairing the backwash valves and shutter bodies in the filters of the Rammanahalli Drinking Water Treatment Plant, Mysore
Repairing the backwash valves and shutter bodies in the filters of the Rammanahalli Drinking Water Treatment Plant, Mysore
Supply and Fixing of EB service line, PVC Insulated and Sheated 3 Core 2.5Sq.mm Copper Cable, HDPE Hose,Gi Pipes and Pipe Laying Plumbing work in Railway line south (34/48), Jothi Talkies merkku street (34/19), Ayyasamy Park at Division 34, Ammap
Supply and delivery of HDPE Hose,Gi Pipe, Gi specials and other particulars pipe line work etc, Complete. i.Railway line south [34/48]