Loading…
Loading…
1,04,091 results • Best match
Earth Work for excavation of trenches for laying of underground pipeline lowering and jointing of 400mm 450mm 600mm dia RCC pipes fixing of AVP Risers Construction of Haudies and Pumpstands at District Sri Muktsar Sahib
Earth Work for excavation of Trenches for laying of Under Ground Pipe Line, lowering and jointing of 400 mm, 450mm, 600 mm Dia RCC Piped, fixing of AVP , Risers, Construction of Haudies and Pumpstands Etc. at Village Jandwala, Lambi Maan, Maan Singh Wala , Kandukhera at District Sri Muktsar sahib
TTPS ES Circle EM II Providing power supply arrangements from newly installed 125 KVA capacity Diesel Generator Set Change over panel to Sewage Treatment Plant and GLR I II in Camp II quarters area
Laying of 3 1/2 Core x 240 Sq.mm LTUG.Aluminium armoured cable in the excavated earth.(Cable will be supplied by TNPGCL)
Deposit work of Thiruvananthapuram Corporation - Improving Water Supply by Laying 90mm PVC pipe towards Surabhi Gardens and Vrindavan lane in Akkulam Ward under Pongumoodu Section-Pipeline Work
OD114661/2025-2026:Alteration of 20mm (3/4 inch) house connection with 15mm (1/2 inch) water meter from existing PVC / HDPE pipe up to 200mm dia., up to a length of 5 m using 25mm Indian Standard Class 6 uPVC pipe and uPVC / GM / Brass specials viz. brass ferrule, GM full way wheel valve, Elbow, MTA, ...
Day to Day Operation and Maintenance of CENTRAL SECTOR INSPECTION BUNGLOW at LALBAGH WATER TREATMENT PLANT SITE under Berhampore Division - I , PHE Dte. In the district of Murshidaba. Period for 1 (One) Year
Day to Day Operation and Maintenance of CENTRAL SECTOR INSPECTION BUNGLOW at LALBAGH WATER TREATMENT PLANT SITE under Berhampore Division - I , PHE Dte. In the district of Murshidaba. Period for 1 (One) Year.
Repair of old damaged existing water line at F 9/7 Vasant Vihar for improvement of water supply pressure by laying of 100 mm DI pipe in RK Puram constituency under E.E.(C)-28.
Repair of old damaged existing water line at F 9/7 Vasant Vihar for improvement of water supply pressure by laying of 100 mm DI pipe in RK Puram constituency under E.E.(C)-28.
REPAIR TO JOINERY, RENOVATION OF TOILETS/ KITCHEN, INTERNAL WATER SUPPLY, PLUMBING SANITARY FITTINGS, FLOORS/ TILES, PLASTER, CHAJJAS/ PARAPET/ FIN ETC AND OTHER CONNECTED B/R WORKS IN PHASE-I AT AF STN UDHAMPUR
Supply only Integral Water Proofing compound, complete all as specified.