Loading…
Loading…
1,04,306 results • Best match
Repairs and Rewinding to 1600 KVA Burnt Transformer and Repairs to 630 HP motor at Yerragattu Thanda Lift Irrigation scheme located on Left Bank of Krishna River, Gundlapally(V), Mattampally (M) of Suryapet District. (2nd call)
(A)Dismantling of old and used 198 mtr. 6 inch dia pipe and Carrying Laying and Joining 6 inch dia 600 Mtr. pipe line for supply domestic water to 6 No. (B) Carrying Laying and joining of 6 inch dia 500 Mtr. pipe from 6 pit to Chhata dhowra and Bh
Carrying, laying & joining 6” dia bend 12 Nos., And tapper short piece pipe 8 Nos. and 1 No. sluice valve and both side match piece 2 Nos. 1 No. T pipe and 1 No. 6" X 4 " dia Reducer pipe (25 Nos.)
Emergent repair work of roof treatment to stop the leakage of water from different location of roof of the PWD building at K S Roy TB Hospital during the year 2025-26 .
Preparation of drainage spout on roof for bituminous waterproofing treatment after required grading and shaping of the under bed with Cement Concrete (1:2:4) or Cement ...
Repair formed due to pipe laying for 24x7 drinking water supply scheme from on Women college road to Malwa colony Gau Basa Chownk Patiala R.D. 0.00-0.500 Kms PODR-22
eProcurement System Government of Punjab Created By: Peeyush Aggarwal Created Date/Time: 06-Jul-2026 04:12 PM Tender Title: Repair formed due to pipe laying for 24x7 drinking water supply scheme from on Women college road to Malwa colony Gau Basa Chownk Patiala R.D. 0.00-0.500 Kms PODR-22 Tender ID: 2026_CEPW_170381_1
CERTAIN REPAIR TO JOINERY ROOF TREATMENT RCC CHAJJA PLASTERING, PVC WATER TANK FLOOR AND WALL TILING AND CERTAIN SANITARY FITTING AT AF STN INDAURA AND DHANSA UNDER GE (AF) GURGAON
Supplying and laying of CPVC pipes 25 mm outer diameter SDR 11 & Plain CPVC SDR 11 fittings on walls/ceiling or laying in floors complete all as specified
by way of Design and Construction of 3.0 MLD Sewage Treatment Plant, Construction of Interception and Diversion Structures at Outfalls, Conveying Mains, IPSs incl. O and M for 5 years after successful completion of free trial run of 12 months
Construction of Sewage Treatment Plant (3.00 MLD) and Faecal Sludge Treatment with including Aerobic Digester Jungle clearing, site Levelling by Cutting and Filling by way of Survey Design ,Engineering, Supply, construction, erection, hydraulic testing and commissioning of STP including Faecal ...