Loading…
Loading…
1,04,092 results • Best match
Operation and Maintenane of Water Supply and Sewerage Scheme at Samana for the year 2026 to 2027
Establishment Samana Water Supply
SH_Building portion including internal water supply,Sanitary installation,Sewage,drainage work
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. - Internal work - Exposed on wall
PROVISION OF WATER PROOF TREATMENT IN MULTI UTILITY ROOMS OF ADMIN BUILDING OF CGAE KOCHI AND PROVISION OF VENETIAN BLINDS TO WINDOWS OF VARIOUS OFFICES INCLUDING CONNECTED WORKS AT CGAE KOCHI
Supply only integral water proofing compound all as specified and as directed.
SERVICES FOR NON CHROMATE, PHOSPHATE AND ZINC BASED COOLING WATER TREATMENT PROGRAM FOR CT 1 CT 2 AND CT 3 AND OPERATION OF CHLORINE DIOXIDE DOSING SYSTEMS AT GAIL VIJAIPUR FOR A PERIOD OF 02 YEARS
... HIGH SKILLED RESOURCES FOR SERVICES FOR NON-CHROMATE, PHOSPHATE AND ZINC BASED COOLING WATER TREATMENT PROGRAM FOR CT-1, CT-2 & CT-3 AND OPERATION OF CHLORINE DIOXIDE (CLO2) DOSING SYSTEMS... THEREFORE, TOTAL 1248 MANDAYS ARE CONSIDERED FOR 24 MONTHS. PLEASE REFER DETAILED SCOPE OF WORK, SCC OF THE TENDER DOCUMENT FOR FURTHER DETAILS ON NATURE OF JOB IN THIS CATEGORY.
AMRUT 2.0 - Upgradion of UWSS to Punalur Muncipality - I-RENOVATION OF EXISTING UWSS TO PUNALUR MUNICIPALITY SCHEME BY REPLACEMENT OF AC PIPES WITH PVC AND RENOVATION OF 9 MLD WATER TREATMENT PLANT-General Civil Work
100.60.1.1.2:Providing 15mm (1/2 inch) house connection with 15mm (1/2 inch) water meter from existing PVC / HDPE mains up to 110 mm dia., up to a length of 5 m using 20mm Indian Standard Class 6 uPVC pipe and uPVC / GM / Brass specials viz. brass ferrule, GM full way wheel valve, Elbow, MTA, ...
Annual Maintenance estimate for water supply and Sewerage scheme in Auto Market, Hansi for the year 2025-26.
... consultancy services for examine the possibilities for construction of 12.00 MLD Canal based Water Treatment Plant(WTP) instead of 6.00 MLD WTP (as per decision of the competent authority) in Hansi, Sector-3, ...