Loading…
Loading…
1,05,429 results • Best match
Deployment of Un-Armed Security Guard Armed Security guard with uniform and other charges for Bally Jagacha Water Treatment Plant Intake Premises (Bhanga Ghat, Bally) Under Howrah Division, PHE Dte.(Period for O M-365 days)
Deployment of Armed security guard with uniform and other charges for Bally Jagacha Water Treatment Plant under Howrah Division, PHE Dte. i) For Main Gate Of WTP a) Night Shift -1 No. Total -... No. X365 days = 365 Nos Man Days The charges for engagement of security guards for the work of guarding at WTP & Intake Premices minimum payment for wages @Rs. 487.00 per day per ...
Construction of Sewage Treatment Plants (STP) of varying capacities of 2.44 to 7.84 MLD at Shorapur, Hunasagi, Kakkera & Kembhavi ULBs of Yadgir District along with 5 years Operation & Maintenance (including 1-year Defect liability period) under Swachh Bharat Mission (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model. (Package-SBM/KLB/Pkg-8)
Construction of Sewage Treatment Plants (STP) of varying capacities of 2.44 to 7.84 MLD at Shorapur, Hunasagi, Kakkera & Kembhavi ULBs of Yadgir District along with 5 years Operation & Maintenance (including 1-year Defect liability period) under Swachh Bharat Mission (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model. (Package-SBM/KLB/Pkg-8)
Providing Ornamental Teakwood Double leaf, Single leaf fully panelled door shutters, PVC Water stopper, Expansion Joint Treatment and applying Epoxy Grout in FF,SF toilet works for Construction of DPO Mayiladuthurai
Expansion Joint Treatment with Seal Tape Providing and laying with 1.0 mm thick FPO membrane to seal the expansion joint.
Building portion including internal water supply, sanitary installation, sewage and drainage works
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. - Internal work - Exposed on wall
Building portion including internal water supply, sanitary installation, sewage and drainage works.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. - Internal work - Exposed on wall
Building portion including internal water supply, sanitary installation, sewage and drainage works
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. - Internal work - Exposed on wall