Loading…
Loading…
94,467 results • Best match
Construction of toilet block for ladies at Dhom Irrigation Section No. 3,Rahimatpur under Dhom Irrigation Sub- division Koregaon , Repairs to the ladies toilet at Lift Irrigation Sub- division No.-01, Rahimatpur (H.Q.- Satara) and Necessary repairs
eProcurement System Government of Maharashtra Created By: YOGESH SHINDE Created Date/Time: 27-Apr-2026 01:14 PM Tender Title: Construction of toilet block for ladies at Dhom Irrigation Section No. 3,Rahimatpur under Dhom Irrigation Sub- division Koregaon , Repairs to the ladies toilet at Lift Irrigation Sub- division No.-01, Rahimatpur (H.Q.- Satara) and Necessary repairs Tender ID: 2026_CWRDP_1286914_9
Supply and Installation of APFC Panel for 4.5 MGD Water Treatment Plant Shyamlla Hills, 2MGD Raw Water Pump House Boat club and Badal mahal WTP Under Zone No. 05.
Supply and Installation of APFC Panel for 4.5 MGD Water Treatment Plant Shyamlla Hills, 2MGD Raw Water Pump House Boat club and Badal mahal WTP Under Zone No. 05.
Providing and laying pipe culvert by trenchless technology of crossing NH48 for making connection of Drainage System with Storm Water Drain
[21.97.14]`Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISI marked HDPE pipe of PE-100 grade and PN-6 for sewer. application as per IS 14333-1996 (amended up to date) in trenches in complete including cost of HDPE Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer. Note: E/w to be measured and paid separately. Rate includes cost of all specials like bends, tees required during laying of pipe line along required alignment. ` 14. 900 mm Outside Dia [Through Rate]
Annual Maintenance Estimate
NS Item) Supplying and dozing of Liquid Chlorine Gas filled in 900 Kg. tonner (tonner provided by the Deptt.) exclusive of GST, carriage, Loading, unloading, Testing and Insurance complete job for water Treatment Plant, Main water Works, Sector-1, Rohtak complete in all respect and all other works contingent thereto.
P/L water proofing treatment
Providing and laying in situ seven course water proofing treatment with APP (Atactic poly-propylene) modified Polymeric memberane over roof consisting of first coat of bitumen primer @ 0.40 litre per sqm, 2nd, 4th & 6th courses of bonding material @ 1.20 Kg/sqm, which shall consist of blown type bitumen of grade 85/25 conforming to IS : 702, 3rd and 5th layers of roofing membrane APP modified Polymeric membrane 1.5 mm thick of 2.25 Kg/sqm weight consisting of five layers prefabricated with centre core as 20 micron HMHDPE film sandwiched on both sides with polymeric mix and the polymeric mix is protected on both side with 20 micron HMHDPE film.7th, the top most layer shall be finished with brick tiles of class designation 10 grouted with cement mortar 1:3 (1cement : 3 fine sand) mixed with 2% integral water proofing compound by weight of cement over a 12 mm layer of cement mortar 1:3 (1 cement : 3 fine sand) and finished neat (item of laying brick tiles shall be paid for separately).
nstallation of Triple Vessel 16 x65 2000 L p h RO Water Treatment Plant and water supply arrangement at Digital Library and Residential training Center , Dist- Sahebganj
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 15mm nominal dia Pipes