Loading…
Loading…
94,474 results • Best match
Supply and Delivery of Gas Chlorination cylinder to existing Chlorination plant at Thalayuthu water treatment plant works of oddanchatram municipality
Supply and Delivery chlorination as per ISI specification 99.80% moisture Na2O3 Hydrogen and carbon dioxide full for water treatment plant.The rate inclusive of loading unloading and transportation charges as directed by the departmental officer.
Repairs To Escape Gates CR HR Of Various Sizes At Sina Madha Lift Irrigation Left Bank Canal And Pimpalner
Repairs To Escape Gates/CR/HR Of Various Sizes ( 1.2 M x 1.2 M, 0.45 M X 0.45 M, 0.3 M X 0.3 M) At Sina Madha Lift Irrigation Left Bank Canal And Pimpalner DY Which Includes Material, Labour, Workshop Charges, Sundry Charges, Handling Charges, Transportation etc. All Complete Job. Schedule B
Restoration of Lift irrigation Scheme Majhiar Sera Pakhrol Phase 1st and 2nd in Tehsil Nadaun Distt.Hamirpur.
Clearing jungle including uprooting of rank vegitation, grass, bush wood, trees and sapling of girth upto 30 cm measured at a height of 1 mtrs above ground and removal of rubbish upto a distance of 20 mtrs outside the prepheri of the area cleared upto 30cm girth within all leads and lifts as per the direction of Engineer-in-charge.
Balanced Earthwork And Lining Work On Wadala Branch Offtaking RD 31750 From Main Canal Of Mokhabardi Lift Irrigation Scheme.
eProcurement System Government of Maharashtra Created By: PRASHANT GODE Created Date/Time: 30-Jan-2026 03:45 PM Tender Title: Balanced Earthwork And Lining Work On Wadala Branch Offtaking RD 31750 From Main Canal Of Mokhabardi Lift Irrigation Scheme. Tender ID: 2025_CEWRD_1220856_11
GENERAL-AMC 2025-26 Kandampuzha Lift, Kandampuzha Relift, and Paratharakandom-Fully Comprehensive Annual Maintenance of LIS Under Electrical Lift Irrigation Section Ramamangalam-General Electrical Work
OD58382/2025-2026:Fully Comprehensive Annual Maintenance of upto 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor thorughout the AMC period whenver necessary (excluding rewinding) repairs of vaccum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pumpset, base plate all time during the period of contract and the faults should be rectified with in the time allowed.(Total 3 motors,12 month for each motor)
Ins of Water Treatment Plant near HO Esrail Master at SN XX under JAGP
eProcurement System of Government of West Bengal Created By: KLINTON MONDAL Created Date/Time: 04-Jul-2025 02:47 PM Tender Title: Ins of Water Treatment Plant SL5 Tender ID: 2025_ZPHD_851823_5