Loading…
Loading…
10,433 results • Best match
Construction of intermediate pumping stations IPS including PL of sewer network rising main and allied works at Baramulla
Provision for repair and restoration of under ground utilities like water supply pipes (G.I, HDPE, Cast Iron,MS Pipe etc) Telephone Cables and optic fibre etc, inlcuding all accessories required to rectify the damage caused to its original position in all respects including all carriages all told to be paid as per actual.
Repair and painting work of the existing Secretary office and meeting hall at NMY Meerut
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stablity for hot & cold water supply, Including all CPVC plain & brass threaded fitting i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fitting, with one step ...
Repairs and maintenance to control room building at Poiguinim 33 11kv Sub station.
Providing and fixing chlorinated ployvinyl chloride (CPVC) pipes confirming to IS:15778, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipes with clamps at 1 mt. spacing. This includes jointing of pipes and fittings with one ...
Re-Invite-Renovation of office of coordinator(NSS) MDU Rohtak
[22.86.2]Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes and fittings with one ...
Renovation of Drivers Rest Room at Director of Agriculture Office Complex.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement ,trenching ,refilling & testing of joints complete as per direction of Engineer in Charge. 25 mm nominal outer dia .Pipes.
Estimate for Repair of XEN residence and boundary wall
INTERNAL- EXPOSED ON WALL : ProvidingandfixingChlorinatedPolyvinyl Chloride(CPVC)pipesasperIS15778(ISI marked with the prior approval of Engineer-in-Charge), having thermal stability for hot & cold water supply, includingallCPVCplain&brassthreaded fittings including fixing the pipe with clamps at ...