Loading…
Loading…
10,546 results • Best match
Construction of Urdana to Krishnapur Khairpur Road Length 3.40 Km.
Providing and laying Reinforced Cement Concrete pipe NP 4 / prestressed concrete pipe (Laying Reinforced cement concrete pipe NP4 /prestressed concrete pipe for culverts including fixing collar with cement mortar 1:2 but excluding bedding below pipe excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) C 1000 mm dia
81250/E8 PROVN OF 11KV HT AVR OF MINIMUM CAPACITY 800 KVA FOR STEPPING UP OF HT VOLTAGE UNDER GE MINNIEBAY.
Excavation in trenches any type of soil not exc 1.5 mtr wide and not exc 1.5 mtr in depth for foundation, pipe, laying of cable etc not exc 10 Sqmtr on plan and not exc 1.5 mtr in depth and getting out complete all as specified and as directed.
bandha darmpura goshala construction and maintenance vikas work 1 nit 4
... and ramming of bottoms, ncluding getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...
Construction and maintenance of missing link of sewer line and manholes at various places in Zone -1 NNJ (ARC)
... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...
Construction and maintenance of missing link of sewer line and manholes at various places in Zone 2 NNJ (ARC)
... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...
PROVN OF LIGHTING PROTECTION SYSTEM BY ESE (EARLY STREAMER EMISSION) AND CERTAIN MINOR WORK AT CIJW SCHOOL VAIRENGTE MIL STN
Excavation in trenches / post holes in soft/loose soil not exceeding 1.5 mtr wide and not exceeding 1.5 meter in depth for taking out and laying pipe lines not exceeding 10 Sqm on plan and getting out, excavated earth, forming bottom surfaces to required level complete all as specified and directed by Engr-in-Charge.