Loading…
Loading…
10,002 results • Best match
Improvement works to water supply main pipe line at ward 6 east Zone
Earth work Excavation in all soils for Water Supply Laying work Including Refilling the Excavated Earth etc complete
Sinking of borewel For drinking water supply at Idaga Maidan Ward No 08
Sinking of borewel For drinking water supply at Venkateshwar Nagar
Parching of Air Valve and purching of water supply matirel Tp hirekerur Ltd
Parching of Air Valve and purching of water supply matirel Tp hirekerur Ltd
Maintaining water supply by deployment of staff at various BPS in Sec 5 and Sec 11 Rohini
Maintain Water Supply – To maintain water supply from various booster pumping station (LT installation) as per prevalent schedule in break duty hrs (Morning & Evening) as per direction of engineer-in-charge by operating all electrical and mechanical equipment, minor maintenance i.e. filling of gland, greasing, replacement of coupling tyre, operation of UGR intake valve, minor maintenance in LT panel etc. & to maintain proper cleanliness of pump house by deploying of semi- skilled/trained staff, 1 no. in day shift break duty, detail of sites is as under 4 Nos. semi skilled:- 1. A-1 Sec 05 Rohini BPS 2. B-5 Sec 11 Rohini BPS 3. 480 SFS Pkt. 10 Sec 11 Rohini BPS 4. E-2 Sec 11 Rohini BPS
O and M Water Supply Schemes AMC 2026_27 CWSS to Kuthanur GPGeneral Civil Work
100.9.1:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 20 mm nominal outside diameter pipes.
UPKEEP MAINTENANCE OF WATER SUPPLY INSTALLATION PUMP HOUSE AND CONNECTED WORKS
Supply only water proofing compound