Loading…
Loading…
10,219 results • Best match
Engaging Manual Workers for Outsourcing of Works for Three Months in Engineering Wing (water supply works) at Gobichettipalayam Municipality
Engaging Manual Workers for Outsourcing of Works for Three Months in Engineering Wing as water supply workers (Tank and Valve operating works complete as directed by the departmental officers including of all taxes and duties, etc. complete as per PWD SOR, etc for the period of three months - Electrician Gr II
KTPS-VII Stage - Civil - O and M-I - SD-III - Clearing and lifting of jungle growth from material gate to raw water reservoir and along ash disposal pipelines up to KTPS(O and M) boundary wall for two (2) times during the year 2026-27
Augmentation of Water supply , Sewerage , Drainage System and Street Lightening in Village Sihi, Faridabad in Ward No 39 (Recall)
provision of making water supply arrangement to dissolve the cow dung
(A) Meals, tea, and breakfast (twice daily) for 25 personnel (police force and others) (B) Drinking water arrangement for police force and others Supply of RO water at each camp
(A) Food tea and snacks for 25 persons for both the times to police force and others 2 camps x 25 persons x 123 days 04 months total 6150 days more less as per requirement Supplied for camp sites 1 Nisarpur 2 Manawar (B) Drinking water arrangement for police force and others: Supply of RO water at each camp.
REPAIR AND MAINTENANCE OF WATER SUPPLY PUMPING LINES , SLUICE VALVES AND CONNECTED WORKS AT KATARIBHAGH AND NAVAL BASE KOCHI
Attending any type of leakage/shortage/overflow in water supply Pumping lines laid at various locations inside Kataribagh and Naval Base area for detection of nature of defect including carry out minor repairs to make the pumping line functional complete all as specified and directed . Notes :- (a) The unit rate quoted shall be deemed to be included the elements of labour only for arresting the leakage and making the pumping line functional for minor repair releasing air locks, checking closed valves any, etc. If replacements of pipe/items is required to make the supply line functional, the cost of labour and material for the same shall be measured and paid as "Supply & fix/Material & labour in repairs" under relevant items of this schedule here in after. (b) If leakage/shortage shall not be attended & rectified in the same day as received by the contractor except major break down, the recovery will be made @ Rs 500/- per breakdown per day and after 15 days of non functional of any pumping line, as specified for any reason, the recovery will be made @ 2000/- per day till the distribution line functional
MAINTAINENCE AND REPAIR REPLACEMENT AND UPKEEP OF WATER SUPPLY SYSTEM OF ZONE 1 TO 3 AT MILSTN GANDHINAGAR
Excavation by manpower with necessary tools and equipments standard/specialistfor making trenches in any type of soil not exceeding 1.5 m wide and not exceeding 1.5 m in depth without hampering the existing services like PNG, NFS, Water supply line, Electric supply line Incl getting out Soft/Loose soil complete all as specified by Engr-in-charge.