Loading…
Loading…
9,684 results • Best match
REPAIR / REPLACEMENT OF CORRODED GI PIPE LINES, CI/DI PIPE LINES, MAINTENANCE OF MAIN WATER SUPPLY LINES UNDER GE GOLCONDA
Supply and lay of 20mm dia 3-layer PP-R Polypropylene random copolymer) concealed pipes SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply including all PP-R plain & brass threaded polypropylene random fittings fixed complete to walls, ceilings or in floors etc. including taking up or down existing pipe with fittings complete all as specified and as directed.
Repairing of water supply pipe line from Sinidih filter plant to Sinidih Excavation workshop under Govindpur Area
Dismantling G.I. pipes (external work) including excavation and refilling trenches aftertaking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge : Above 40 mm nominal bore
Refer to BOQ
Providing and fixing HDPE Pipes complete with G.I. fittings excluding trenching and refilling etc. HDEP PIPE 75 mm
As Above
Constructing of 1 No. RCC OHSR of 50KL (50000 ltr) Capacity having staging Height 17.00 mtr. & FSL 20.00 mtr from formation level complete with external RCC Stair case with landing slabs at each staging RCC roof, ventilator single manhole cover lightning conductor etc. complete as described in schedule No.3 providing and fixing CI/ DI K9 D/F expansion Joints, bell mouth and D/F puddle collars as per DWSS design on basis of enclosed drawing Duck foot bends, Conforming IS-9523 with latest amendments) and D1 19 D/F sluice Valve duty ISI marked (IS 14846-2000 Or latest on each with inlet outlet and scour pipes. Including Providing and Installing inlet outlet scour pipe and overflow DI K-9 double flanged pressure pipes centrifugally cast as per IS 8329-2000 with latest amendment duly ISI marked from bottom dome to duck foot Bend and further up to 2.75 mtr. As per detail specification TMT steel & painting of all complete shall he included in cost & P/F aluminum ladder inside/steel ladder outside tank of the OHSR including testing of soil bearing capacity tested from the reputated institute such as PEC Chandigarh / TTT Sector-26, Chandigarh GNEC/Ludhiana/Thapar Institute of Engineer and Technology Patiala Complete in all respect SBC shall be tested in the presence of Engineer or his representative as per specifications. (The specifications & drawing are based on safe bearing capacity of Soil is not less than 8.75 tons per sqm. In case the safe bearing capacity of soil is less than 8.75 tone per sqm. The contractor shall submit his own design keeping in view seismic Zone-IV for foundation portion based on actual safe bearing capacity as per DWSS specifications. The difference in quantities from the standard, drawing based on 8.75 tone per sqm safe bearing capacity will be paid as per CSR+ Prevailing Ceiling Premium including overflow houdi, including providing and fixing water Level indicating system and construction of plinth protection around OHSR with masonry toe wall with including foundation depth, earthing cc 1:8:16 with 40mm stone aggregate and conglomerate floor 40mm with CC 1:24 as per DWSS specification. Providing & applying, integral crystalling slurry of hydrophilic in nature for water proofing management for vertical and horizontal surface and swellable type water stop tape.
Inter Connection T-milan with Pipe Line Work in Tubewell Water Supply System at Different Place of Ward No. 58. File No. 18/26X9/1
Water Supply, Item No. 9.14, Page No. 135 Providing and laying in position Cast Iron plain ended Tees Body & Branch. Class 20 80 x 80 mm
Supply, Installation and Testing of Supply of 02 Nos. 10 HP 3 Phase Monoblock pump for Drainage water at Sheetla Power House, Moth Jhansi
a) Supply of 02 Nos,10 HP 3 Phase Monoblock pump for Drainage water at Sheetla power house. (01 Job) Specification are as follows: Discharge: 1000 LPM, Outlet Diameter: 100mm Suction Head: 15m Voltage: 415V Make: Crompton/Kirloskar/Lubi/CRI/ Mody b) Fixing of new 02 Nos,3 phase 10HP Monoblock pump after Dismantling of old and damaged Drainage pump in complete at Sheetla power house. (01 Job) c) Providing and fixing 100 mm dia B-class Jindal, JTC, ISI marked G.I. pipes complete with special such as bend, tee, socket, cross, clamp etc earth work including filling the trenches etc required for proper completion of the work. the rate also includes concealed GI fitting where required, cutting and making good the walls etc and all materials, labour and T&P complete for both Monoblock pumps. (30 Mtr.) d). Providing and fixing full way 100mm dia G.M. gate valve with wheel, ISI mark heavy quality including supply of all materials, labour and T&P required for proper completion of work for both Drainage pump pipeline. (04 Nos.) e) Testing and commissioning of complete system after installation of 02 Nos. 3 Phase 10 HP Monoblock pump at Sheetla Power House. (01 Job)