Loading…
Loading…
9,624 results • Best match
Operation and Maintenance of Iron Elimination Plants at Donnagar Water Supply Scheme under Barasat Sub Division, P.H.E. Dte.
Opening & closing of all the different dia sluive valves on different places along the alignment of the rising main and distribution main within Head Works Site daily as and when required for regulating the supply of water and distributing water all over the command area smoothly including changing and restoration of gland packing of sluice valve, air valve if required including opening the cap/plug of wash out point or opening the sluice valves including de-jointing flange joints including repairing works and cleaning the pipeline or changing of gate, spindle or liner etc. of sluice valves all complete, restoration works to be done including earth work in the excavation bailing out of water, re-filling the excavated earth, taking out of RCC slab or slab cover and refaxing true to position etc. all complete as per the specification and direction of EIC. [The agency shall have to pay the guard @ Rs. 421.00 + 22.00 + 22.00 + 22.00 = 487.00 {As per Order of Additional Chief Secretary to the Government of West Bengal, Vide Memo No.- PHE/1095, Dated.- 22/05/2025 }/ Head/ Day as Wage + 8.33% bonus. Payment receipt of wage to be submitted monthly and bonus to be paid before Puja/ Idal Utsav on proper receipt] N.B. : Rate per day per Head = (Rs.487.00 + 8.33% Bonus)= 527.57 + 24.35 {5% Overhead Expenses}= 551.92 + 52.76 + (Add Contractor profit 10%) =604.68 And ESIC Contribution of Employers @3.25% & EPF Contribution of Employers @11% = Rs [604.68 +15.83 +63.31] = 683.82 = 684.00 Note : Considering ESIC & EPF applicable 30 days per month vide order no. PHE/1095/0-5/16(PT) Dt.- 22-05-2025 w.e.f. 01/04/2025 = (487 x 12 months x 26 days) /365 days). [Emplyees Contribution of EPF & ESIC will be deducted from his daily wages]
Operation and Maintenance of Iron Elimination Plants at Deara Water Supply Scheme under Barasat Sub Division, P.H.E. Dte.
Opening & closing of all the different dia sluive valves on different places along the alignment of the rising main and distribution main within Head Works Site daily as and when required for regulating the supply of water and distributing water all over the command area smoothly including changing and restoration of gland packing of sluice valve, air valve if required including opening the cap/plug of wash out point or opening the sluice valves including de-jointing flange joints including repairing works and cleaning the pipeline or changing of gate, spindle or liner etc. of sluice valves all complete, restoration works to be done including earth work in the excavation bailing out of water, re-filling the excavated earth, taking out of RCC slab or slab cover and refaxing true to position etc. all complete as per the specification and direction of EIC. [The agency shall have to pay the guard @ Rs. 421.00 + 22.00 + 22.00 + 22.00 = 487.00 {As per Order of Additional Chief Secretary to the Government of West Bengal, Vide Memo No.- PHE/1095, Dated.- 22/05/2025 }/ Head/ Day as Wage + 8.33% bonus. Payment receipt of wage to be submitted monthly and bonus to be paid before Puja/ Idal Utsav on proper receipt] N.B. : Rate per day per Head = (Rs.487.00 + 8.33% Bonus)= 527.57 + 24.35 {5% Overhead Expenses}= 551.92 + 52.76 + (Add Contractor profit 10%) =604.68 And ESIC Contribution of Employers @3.25% & EPF Contribution of Employers @11% = Rs [604.68 +15.83 +63.31] = 683.82 = 684.00 Note : Considering ESIC & EPF applicable 30 days per month vide order no. PHE/1095/0-5/16(PT) Dt.- 22-05-2025 w.e.f. 01/04/2025 = (487 x 12 months x 26 days) /365 days). [Emplyees Contribution of EPF & ESIC will be deducted from his daily wages]
Construction and Execution of Retrofitted Piped Water Supply Scheme under Jal Jeevan Mission at Verious Villages of Block Rewa, Distt. Rewa (M.P.)
Construction and Execution of Retrofitted Piped Water Supply Scheme under Jal Jeevan Mission at Village Dadar, Amiriti, Umari (Awadesh), Godhar, Bhitwa, Block Rewa, Distt. Rewa
Permanent Reconstruction work of water supply scheme SANGAR in pouni Block in Sub Div Reasi under SASCI
Installation of Functional House Tap Connection , the work shall consist of laying of requsite pipes brass ferrule incl boring and tapping the main GI Pipeline besides providing and fitting of Brass Bib Cock complete (The Brass Ferrule and Brass Bib Cock shall be as per IS specifications with approval of Engineer in charge and shall be provided by the contractor)
Design and Construction of Balance Work Piped Water Supply Scheme under Jal Jeevan Mission at Village - Babai Block Palera distt. Tikamgarh
Design and Construction of Balance Work Piped Water Supply Scheme under Jal Jeevan Mission at Village - Babai Block Palera distt. Tikamgarh based on including installation of electric submersible water motor pump, distribution pipe line system, household tap connections, electric power connections including cost of all material & labour with 90 Days Trial Run/Commissioning period as per BOQ enclosed. (As per Detailed BOQ Attached with detail NIT)
Custom Bid for Services - Erection of Water Supply Arrangement through 75 mm HDPE Pipe for Water Spraying at Coal Stocks of Quarry-1 of AGPEOCM under GPSA Similar Category Manpower Outsourcing Services - Man-days based
Custom Bid for Services - Erection of Water Supply Arrangement through 75 mm HDPE Pipe for Water Spraying at Coal Stocks of Quarry-1 of AGPEOCM under GPSA Similar Category Manpower Outsourcing Services - Man-days based