Loading…
Loading…
9,624 results • Best match
ANNUAL MAINTENANCE ESTIMATE FOR WATER SUPPLY SCHEME REWARI TOWN FOR THE YEAR 2026-2027 (SECTION 3)
Repair of Horizontal pumping sets for water works, boosting station and tube wells consisting mainly of motor, pump, electrical control panel, starter, cable, wires of all type, capacitors, volt meters ampere meters, main switches, Kit Kats, change over, lighting arrangement etc. Including all electric installation complete and all accessories i.e. sluice valves, non return valves etc. pertaining to pumping machinery inside the premises of water works, Boosting station and tube wells and all other works contingent. Upto 20 BHP
Annual Maintenance of Road, Water Supply, Sewerage and SWD Scheme in Sector 18 Rewari 2026-27
P/Laying Interlocking tiles Street of Pinki Devi to Ashok Mishra Near Water Supply Pump Street Omesh Kumar in Ward No.02
P/Laying Interlocking tiles Street of Pinki Devi to Ashok Mishra & Near Water Supply Pump Street Omesh Kumar in Ward No.02
Construction and Execution of Retrofitted Piped Water Supply Scheme under Jal Jeevan Mission at Verious Villages of Block Raipur, Distt. Rewa (M.P.)
Construction and Execution of Retrofitted Piped Water Supply Scheme under Jal Jeevan Mission at Village Badagaon, Jarha, Raghurajgarh, Umari, Block Raipur, Distt. Rewa
Providing manpower on outsourcing basis for operation and maintenance of Renuka Sagar Reservoir, Water Treatment Plant, distribution system, and allied works within town limits under the jurisdiction of the Water Supply Department for the year 2026-27
Assistant Water Supply Operator TMC RMD
Operation and Maintenance of Iron Elimination Plants at Shibalaya Water Supply Scheme under Barasat Sub Division, P.H.E. Dte.
Opening & closing of all the different dia sluive valves on different places along the alignment of the rising main and distribution main within Head Works Site daily as and when required for regulating the supply of water and distributing water all over the command area smoothly including changing and restoration of gland packing of sluice valve, air valve if required including opening the cap/plug of wash out point or opening the sluice valves including de-jointing flange joints including repairing works and cleaning the pipeline or changing of gate, spindle or liner etc. of sluice valves all complete, restoration works to be done including earth work in the excavation bailing out of water, re-filling the excavated earth, taking out of RCC slab or slab cover and refaxing true to position etc. all complete as per the specification and direction of EIC. [The agency shall have to pay the guard @ Rs. 421.00 + 22.00 + 22.00 + 22.00 = 487.00 {As per Order of Additional Chief Secretary to the Government of West Bengal, Vide Memo No.- PHE/1095, Dated.- 22/05/2025 }/ Head/ Day as Wage + 8.33% bonus. Payment receipt of wage to be submitted monthly and bonus to be paid before Puja/ Idal Utsav on proper receipt] N.B. : Rate per day per Head = (Rs.487.00 + 8.33% Bonus)= 527.57 + 24.35 {5% Overhead Expenses}= 551.92 + 52.76 + (Add Contractor profit 10%) =604.68 And ESIC Contribution of Employers @3.25% & EPF Contribution of Employers @11% = Rs [604.68 +15.83 +63.31] = 683.82 = 684.00 Note : Considering ESIC & EPF applicable 30 days per month vide order no. PHE/1095/0-5/16(PT) Dt.- 22-05-2025 w.e.f. 01/04/2025 = (487 x 12 months x 26 days) /365 days). [Emplyees Contribution of EPF & ESIC will be deducted from his daily wages]